Friedrich Vorwerk Group Stock price
Compare with Peer Group
📊 Peer Group
📈 What is it?
The peer group consists of the companies with the most similar business model. They serve as a benchmark for putting a stock into context.
🧮 How is it selected?
Based on similarity of business model, meaning companies from the same industry with comparable products and a similar customer base. That's the only way to compare apples to apples.
🏛️ Why does it matter?
Whether a stock is cheap or expensive is best judged by comparison. A P/E of 18 or an EV/FCF of 20 can look cheap or expensive depending on the yardstick. The peer group gives you the most accurate one: companies with a similar business model that operate under the same conditions.
🎯 What does it mean for investors?
When a metric sits below the peer average, the stock is valued more cheaply relative to its competitors, and above the average more expensively. A discount to the peer group can be an opportunity, but it can also have a reason (for example lower growth). The comparison is a starting point, not a verdict.
AI Insights on Friedrich Vorwerk Group
Insights
Invest better with AI
StocksGuide Unlimited – full access to AI analyses
👉 More detailed insights
👉 Exclusive perspectives on opportunities & risks
👉 Clear answers to your questions
Invest better with AI
StocksGuide Unlimited – full access to AI analyses
👉 More detailed insights
👉 Exclusive perspectives on opportunities & risks
👉 Clear answers to your questions
Invest better with AI
StocksGuide Unlimited – full access to AI analyses
👉 More detailed insights
👉 Exclusive perspectives on opportunities & risks
👉 Clear answers to your questions
Invest better with AI
StocksGuide Unlimited – full access to AI analyses
👉 More detailed insights
👉 Exclusive perspectives on opportunities & risks
👉 Clear answers to your questions
Is Friedrich Vorwerk Group a Top Scorer Stock based on the Dividend, High-Growth-Investing or Leverman Strategy?
As a Free StocksGuide user, you can view scores for all 9,102 stocks worldwide.
StocksGuide Premium
StocksGuide Unlimited
Key metrics
📘 Market Capitalization
📈 What is it?
Market capitalization shows how much a company is currently worth on the stock market.
🧮 How is it calculated?
🏛️ Why is it important?
It helps classify companies by size (Large, Mid, Small Cap) and indicates their market presence and relative stability.
🧮 Calculation
🎯 What does this mean for investors?
- Large-cap companies tend to be more stable, often pay dividends, but may grow more slowly.
- Smaller firms may offer higher growth potential but come with more volatility.
- Market capitalization is a useful indicator of company size — but not a measure of whether a stock is undervalued or overvalued.
📘 Enterprise Value (EV)
📈 What is it?
Enterprise Value represents the total cost to acquire a company — including its debt and excluding its cash reserves.
🧮 How is it calculated?
(= Market Cap + Net Debt)
🏛️ Why is it important?
EV gives a more complete picture of a company's value than market cap alone and is used in key valuation ratios like EV/FCF or EV/Sales.
🧮 Calculation
🎯 What does this mean for investors?
- Enterprise Value shows the true cost of buying a company, including all financial obligations.
- It is more accurate than just looking at market cap, especially when comparing companies with different levels of debt or cash.
- Professional investors prefer EV-based multiples because they better reflect the company’s full financial footprint.
📘 Net Debt
📈 What is it?
Net Debt shows how much debt remains after subtracting a company’s available cash reserves.
🧮 How is it calculated?
🏛️ Why is it important?
It indicates how dependent a company is on borrowed money and how easily it can service its debt in the short term.
🧮 Calculation
🎯 What does this mean for investors?
- Low or negative net debt signals financial strength and flexibility.
- Companies with strong cash positions are better positioned in crises.
- High net debt increases financial risk — especially in environments with rising interest rates or economic downturns.
📘 Cash
📈 What is it?
Cash represents all liquid assets a company can access immediately — including cash, bank deposits, and short-term investments.
🧮 How is it calculated?
🏛️ Why is it important?
It reflects a company’s financial flexibility and resilience — enabling investments, buybacks, or buffer in downturns.
🧮 Calculation
🎯 What does this mean for investors?
- A strong cash position means greater room for maneuver and crisis resistance.
- Cash-rich companies can invest, pay down debt, or repurchase shares.
- But excess idle cash might indicate a lack of growth opportunities.
📘 Shares Outstanding
📈 What is it?
Shares outstanding represent the total number of a company’s shares currently held by investors — excluding treasury stock.
🧮 How is it calculated?
🏛️ Why is it important?
It’s the basis for key metrics like Earnings Per Share (EPS), Market Capitalization, or the Price/Earnings ratio (P/E).
🧮 Calculation
🎯 What does this mean for investors?
- Fewer shares in circulation typically increase earnings per share — making each share more valuable.
- Share buybacks reduce the number of shares and boost per-share metrics.
- Issuing new shares does the opposite — diluting shareholder value and lowering per-share figures.
📘 Price-to-Earnings Ratio (P/E)
📈 What is it?
The P/E ratio shows how many times a company's earnings per share are reflected in its current share price — in other words, how "expensive" the stock appears relative to its profits.
🧮 How is it calculated?
🏛️ Why is it important?
The P/E ratio is one of the most widely used valuation metrics. It helps investors assess whether a stock appears cheap or expensive compared to its earnings power.
🧮 Calculation
📊 P/E (TTM) = Based on earnings from the last 12 months (Trailing Twelve Months):🎯 What does this mean for investors?
- A low P/E may indicate undervaluation — or signal underlying issues.
- A high P/E may reflect strong growth expectations — or an overvalued stock.
📘 Price-to-Sales Ratio (P/S)
📈 What is it?
The P/S ratio shows how much investors are paying for $1 of the company’s revenue – regardless of profitability.
🧮 How is it calculated?
🏛️ Why is it important?
P/S is especially useful for evaluating growth companies or businesses not yet profitable. It reflects how the market values the company’s sales.
🧮 Calculation
Market Cap = €1.45b | Revenue (TTM) = €738.55m
Market Cap = €1.45b | Estimated Revenue = €777.94m
🎯 What does this mean for investors?
- A low P/S may indicate undervaluation — or low profitability.
- A high P/S can reflect strong growth expectations — or excessive optimism.
- Especially helpful when evaluating companies where profits are low, volatile, or negative.
📘 Enterprise Value to Sales (EV/Sales)
📈 What is it?
EV/Sales shows how much investors are paying for $1 of revenue — considering not just equity, but also debt and cash. It’s the capital structure–adjusted version of the P/S ratio.
🧮 How is it calculated?
🏛️ Why is it important?
It’s ideal for comparing companies with different levels of debt. It reflects a company's true cost relative to its revenue.
🧮 Calculation
Enterprise Value = €1.28b | Revenue (TTM) = €738.55m
Enterprise Value = €1.28b | Forward Revenue = €777.94m
🎯 What does this mean for investors?
- EV/Sales allows for capital structure–neutral company comparisons.
- A lower ratio may indicate undervaluation; a higher one may signal strong growth expectations or overvaluation.
- Especially helpful when evaluating high-growth companies with low or negative earnings.
📘 Enterprise Value to Free Cash Flow (EV/FCF) | ex SBC
📈 What is it?
EV/FCF compares a company’s enterprise value with its free cash flow. The metric therefore shows the multiple of current free cash flow at which a company is valued. EV/FCF ex SBC additionally accounts for stock-based compensation (SBC). While SBC does not represent a direct cash outflow, issuing shares as compensation can dilute existing shareholders. Therefore, SBC is deducted from free cash flow in this adjusted version.
🧮 How is it calculated?
EV/FCF ex SBC = Enterprise Value ÷ (Free Cash Flow (TTM) − SBC)
🏛️ Why is it important?
EV/FCF provides a valuation based on free cash flow and therefore complements earnings-based valuation metrics such as the P/E ratio. The ex SBC version additionally accounts for the economic impact of stock-based compensation and provides a more conservative view from a shareholder perspective.
🧮 Calculation
🎯 What does this mean for investors?
- A low EV/FCF means that enterprise value is low relative to current free cash flow. The reasons should always be considered in the context of the company and its industry.
- A high EV/FCF means that enterprise value is high relative to current free cash flow. This can, for example, reflect high growth expectations or temporarily weak cash generation.
- When SBC is positive and adjusted free cash flow remains positive, EV/FCF ex SBC is generally higher than the standard EV/FCF.
- The metric is particularly useful for companies with relatively stable and predictable cash flows.
- If free cash flow is negative or very low, EV/FCF has limited usefulness and should not be interpreted like a standard valuation multiple.
📘 Price-to-Book Ratio (P/B)
📈 What is it?
The P/B ratio compares a company’s market value to its book value — showing how much investors are paying for each dollar of net assets.
🧮 How is it calculated?
🏛️ Why is it important?
P/B is commonly used for asset-heavy industries like banks or industrials. It helps assess whether a stock is trading above or below its net asset value.
🧮 Calculation
🎯 What does this mean for investors?
- A P/B below 1 may signal undervaluation — or weak profitability.
- A P/B above 1 implies the market expects future value creation (e.g., brand, IP, growth).
- Best used for companies with tangible assets and strong balance sheets.
📘 Dividend per Share (DPS)
📈 What is it?
Dividend per Share shows how much cash a company pays out to shareholders for each share they own – usually on an annual or quarterly basis.
🧮 How is it calculated?
🏛️ Why is it important?
DPS is the absolute value of the payout per share – crucial for income-focused investors and dividend strategies.
🧮 Calculation
🎯 What does this mean for investors?
- A stable or growing DPS often signals a strong, shareholder-friendly business.
- DPS alone doesn’t tell you how attractive the payout is – the stock price also matters (→ see Dividend Yield).
- Long-term dividend growth is often a hallmark of high-quality companies – like the dividend aristocrats.
📘 Dividend Yield
📈 What is it?
Dividend yield shows how large a company’s dividend is in relation to its current share price.
🧮 How is it calculated?
🏛️ Why is it important?
It allows investors to compare dividend payouts across stocks, regardless of price or payout size.
🧮 Calculation
🎯 What does this mean for investors?
- A stable yield can reflect reliable distributions.
- Comparing 1Y and 5Y yield shows whether dividend growth keeps pace with stock price appreciation.
- A low yield isn’t always negative – it can signal strong past performance or growth focus.
📘 Dividend Growth
📈 What is it?
Dividend growth shows how much a company has increased its dividend per share over time.
🧮 How is it calculated?
5Y: Compound Annual Growth Rate (CAGR)
🏛️ Why is it important?
Consistently rising dividends are often a sign of financial strength and shareholder orientation – especially relevant for long-term investors.
🧮 Calculation
🎯 What does this mean for investors?
- Stable dividend growth is a sign of sustainable earning power.
- High dividend growth can significantly boost your total return:
- If a company pays $1 in dividends and increases it by 15% annually over 5 years, you’ll receive $2 per share in year 5 – twice as much as at the start!
📘 Payout Ratio
📈 What is it?
The payout ratio shows what percentage of a company’s earnings (per share) is distributed to shareholders as dividends.
🧮 How is it calculated?
🏛️ Why is it important?
It helps assess whether the dividend is sustainable – especially in relation to the company’s profitability.
🧮 Calculation
🎯 What does this mean for investors?
- A low payout ratio means the company retains more earnings for reinvestment – typical for growth companies.
- A moderate payout (e.g. 25–50%) indicates a healthy balance between returns and reinvestment.
- High payout ratios may seem attractive but can carry risk if earnings decline.
📘 Consecutive Dividend Increases
📈 What is it?
This metric shows how many consecutive years a company has raised its dividend per share – without any cuts or pauses.
🧮 How is it calculated?
(Special dividends are not considered.)
🏛️ Why is it important?
A long track record of increases reflects financial strength, consistency, and shareholder commitment.
🎯 What does this mean for investors?
- A long dividend increase streak builds confidence – especially in volatile markets.
- Such companies are seen as reliable and income-friendly investments.
- The longer the streak, the stronger the company’s dividend discipline.
📘 Revenue
📈 What is it?
Revenue shows how much a company earns in total from selling its products and services – the gross income before any costs are deducted.
🧮 How is it calculated?
🏛️ Why is it important?
Revenue is one of the key figures to assess a company’s size, market position, and growth potential.
🧮 Calculation
🎯 What does this mean for investors?
- Growing revenue indicates rising demand and can be an early signal of future earnings growth.
- Comparing actual and expected revenue reveals trends in the market environment and analyst sentiment.
- Note: Strong revenue alone isn’t enough – margins and profitability matter just as much.
📘 EBITDA
📈 What is it?
EBITDA stands for “Earnings Before Interest, Taxes, Depreciation, and Amortization.” It reflects a company’s operating profit before the effects of financing, taxes, and accounting depreciation.
🧮 How is it calculated?
🏛️ Why is it important?
EBITDA is widely used to evaluate a company’s operating performance – especially across capital-intensive sectors or international comparisons.
🧮 Calculation
🎯 What does this mean for investors?
- A high or growing EBITDA indicates strong operational profitability – independent of taxes, interest, or accounting methods.
- It’s especially useful for comparing companies across sectors or geographies.
- Important: EBITDA is not a net income figure – it excludes key costs like depreciation and interest.
📘 EBIT
📈 What is it?
EBIT stands for “Earnings Before Interest and Taxes.” It reflects a company’s operating profit after depreciation, but before interest and tax expenses.
🧮 How is it calculated?
🏛️ Why is it important?
EBIT is a core profitability metric that shows how well the company performs in its main business operations – independent of capital structure and tax environment.
🧮 Calculation
🎯 What does this mean for investors?
- A high EBIT indicates strong profitability from the company’s core business – before financial and tax effects.
- It allows better comparison between companies with different debt levels or tax structures.
- Compared to EBITDA, EBIT already accounts for depreciation and reflects capital intensity more clearly.
📘 Net Income
📈 What is it?
Net income is the company’s total profit – the amount left after all expenses, taxes, interest, and depreciation have been deducted.
🧮 How is it calculated?
🏛️ Why is it important?
Net income is the most comprehensive measure of a company’s profitability – showing how much actual profit remains after all business and financing costs.
🧮 Calculation
🎯 What does this mean for investors?
- Growing net income indicates that the company is managing all of its costs efficiently.
- It directly influences valuation metrics like P/E ratio and the company’s dividend capacity.
- Over time, net income trends reveal how resilient and profitable the business model really is.
📘 Free Cash Flow (FCF) | ex SBC
📈 What is it?
Free cash flow shows how much cash remains after a company has covered its operating and capital expenditures. FCF ex SBC additionally deducts stock-based compensation (SBC) to adjust the cash flow for the effect of non-cash SBC.
🧮 How is it calculated?
Free Cash Flow ex SBC = Operating Cash Flow − SBC − Capital Expenditures (CAPEX)
🏛️ Why is it important?
FCF reflects a company’s actual financial strength – independent of reported accounting earnings. It shows how much flexibility a company has for dividends, share buybacks, or debt reduction. FCF ex SBC also deducts stock-based compensation and shows how much cash generation remains after SBC.
🧮 Calculation
🎯 What does this mean for investors?
- High free cash flow indicates that a company has strong financial strength – independent of reported earnings.
- It is often a solid basis for sustainable dividends and share buybacks.
- Declining FCF can be a warning sign, even if reported earnings remain stable.
📘 Revenue Growth
📈 What is it?
Revenue growth shows how much a company’s sales have changed compared to the previous year – both on a trailing basis (TTM) and based on forward projections.
🧮 How is it calculated?
Forward = (Expected revenue ÷ Revenue in prior year − 1) × 100
Forward growth is based on analyst estimates for the current fiscal year.
🏛️ Why is it important?
Rising revenue signals growing demand, business expansion, and market share gains – especially important for growth-oriented companies.
🧮 Calculation
🎯 What does this mean for investors?
- Growth is the engine of long-term value creation – especially in tech and growth sectors.
- What matters is not just current growth, but its sustainability.
- Forward projections reflect whether analysts expect continued momentum – or a slowdown.
📘 EBITDA Growth
📈 What is it?
EBITDA growth shows how much a company’s operating profit (before interest, taxes, depreciation, and amortization) has increased or decreased compared to the previous year.
🧮 How is it calculated?
Forward = (Expected EBITDA ÷ EBITDA from prior year − 1) × 100
The forward estimate is based on analyst projections for the current fiscal year.
🏛️ Why is it important?
Growing EBITDA indicates improving operational profitability – regardless of financing or accounting effects.
🧮 Calculation
🎯 What does this mean for investors?
- Strong EBITDA growth signals operational efficiency and scalability – especially during growth phases.
- EBITDA growth can be an early indicator of margin and earnings expansion – but should be assessed alongside revenue and EBIT.
📘 EBIT Growth
📈 What is it?
EBIT growth shows how much a company’s operating profit (after depreciation, but before interest and taxes) has increased compared to the previous year.
🧮 How is it calculated?
Forward = (Expected EBIT ÷ EBIT from prior year − 1) × 100
The forward estimate is based on analyst projections for the current fiscal year.
🏛️ Why is it important?
EBIT growth is a direct indicator of a company’s business performance – taking into account capital intensity through depreciation.
🧮 Calculation
🎯 What does this mean for investors?
- Rising EBIT signals improving operating profitability – even after accounting for depreciation.
- It’s especially important for evaluating companies with significant capital expenditures.
- Combined with revenue and EBITDA growth, EBIT growth provides a well-rounded view of operational progress.
📘 Net Income Growth
📈 What is it?
Net income growth shows how much a company’s bottom-line profit has increased or decreased compared to the previous year – both on a trailing basis (TTM) and based on analyst projections.
🧮 How is it calculated?
Forward = (Expected net income ÷ Net income from prior year − 1) × 100
The forward estimate reflects analysts’ expectations for the current fiscal year.
🏛️ Why is it important?
Net income is the ultimate measure of profitability. Growing net income signals stronger efficiency, cost control, and sustainable earnings power.
🧮 Calculation
🎯 What does this mean for investors?
- Stronger net income boosts valuation, dividend potential, and investor confidence.
- If profits stall while revenue grows, it may signal margin pressure.
📘 Free Cash Flow Growth
📈 What is it?
Free cash flow (FCF) growth shows how a company’s available cash – after covering operating expenses and capital expenditures – has changed compared to the previous year.
🧮 How is it calculated?
🏛️ Why is it important?
Free cash flow reflects real financial strength. Growing FCF indicates more flexibility for dividends, share buybacks, and reinvestment.
🧮 Calculation
🎯 What does this mean for investors?
- Declining FCF may point to rising investments, increasing costs, or weaker operating performance.
- Especially for dividend investors, FCF growth is critical – since dividends are paid from actual available cash.
- A negative trend isn't always bad, but it deserves closer attention.
📘 Gross Margin
📈 What is it?
Gross margin shows how much of a company’s revenue remains after deducting the direct costs of goods sold (like materials and production). It represents the company’s “raw profit” before fixed costs, taxes, and interest.
🧮 How is it calculated?
Or simply: Gross Margin = Gross Profit ÷ Revenue × 100
🏛️ Why is it important?
Gross margin indicates how efficiently a company can produce or procure what it sells. It is a key measure of product-level profitability and pricing power.
🧮 Calculation
🎯 What does this mean for investors?
- A high gross margin suggests strong pricing power and efficient production.
- Falling margins may signal rising input costs or competitive pressure.
- Compared to peers, gross margin offers insights into the quality of a business model.
📘 EBITDA Margin
📈 What is it?
The EBITDA margin shows how much of a company’s revenue remains as operating profit before interest, taxes, depreciation, and amortization.It reflects operating efficiency without being distorted by financing or accounting factors.
🧮 How is it calculated?
🏛️ Why is it important?
The EBITDA margin reveals how much operating income a company generates per dollar of revenue – independent of capital structure and tax effects.
🧮 Calculation
🎯 What does this mean for investors?
- A high EBITDA margin reflects strong core profitability – before accounting distortions.
- It allows for effective comparisons across companies and sectors.
- A stable or growing margin signals efficient cost control and business scalability.
📘 EBIT Margin
📈 What is it?
The EBIT margin shows what percentage of revenue remains as operating profit after depreciation but before interest and taxes.
🧮 How is it calculated?
🏛️ Why is it important?
The EBIT margin reflects a company’s core profitability while accounting for capital intensity (e.g. machinery, infrastructure). It’s especially useful for comparing businesses with different levels of depreciation.
🧮 Calculation
🎯 What does this mean for investors?
- A high EBIT margin shows that the company remains efficient even after factoring in depreciation.
- It’s especially relevant for capital-intensive industries.
- Stable or rising EBIT margins over time are a strong indicator of pricing power and business quality.
📘 Net Margin
📈 What is it?
Net margin shows how much of a company’s revenue remains as bottom-line profit after deducting all costs, interest, taxes, and depreciation.
🧮 How is it calculated?
🏛️ Why is it important?
Net margin reflects a company’s overall efficiency – across operations, financing, and taxation. It shows how much actual profit is generated from each dollar of revenue.
🧮 Calculation
🎯 What does this mean for investors?
- A high net margin means the company is not only strong operationally but also manages financing and taxes efficiently.
- Peer comparisons reveal business quality and competitiveness.
- Declining margins despite revenue growth can be a red flag for rising costs or inefficiencies.
📘 Free Cash Flow Margin | ex SBC
📈 What is it?
The Free Cash Flow Margin shows how much free cash flow a company generates relative to its revenue. In simplified terms, free cash flow is calculated as operating cash flow minus capital expenditures. The Free Cash Flow Margin ex SBC additionally accounts for stock-based compensation (SBC). While SBC does not represent a direct cash outflow, issuing shares as compensation can dilute existing shareholders. Therefore, SBC is deducted from free cash flow in this adjusted metric.
🧮 How is it calculated?
Free Cash Flow Margin ex SBC = (Free Cash Flow − SBC) ÷ Revenue × 100
🏛️ Why is it important?
The Free Cash Flow Margin shows how efficiently a company converts its revenue into free cash flow. Strong free cash flow can provide financial flexibility for dividends, share buybacks, debt repayment, or further investments. The ex SBC version additionally accounts for the economic impact of stock-based compensation and therefore provides a more conservative view of cash generation from a shareholder perspective.
🧮 Calculation
🎯 What does this mean for investors?
- A high Free Cash Flow Margin shows that a company converts a high proportion of its revenue into free cash flow.
- This can provide greater financial flexibility for dividends, share buybacks, debt repayment, or investments.
- The Free Cash Flow Margin ex SBC additionally accounts for potential shareholder dilution from stock-based compensation.
- The long-term trend is particularly important. Declining margins can, for example, result from higher investments, changes in working capital, or weaker operating performance.
📘 Equity Ratio
📈 What is it?
The equity ratio indicates what portion of a company’s total assets is financed by shareholders’ equity – in other words, how much it relies on its own capital.
🧮 How is it calculated?
🏛️ Why is it important?
A high equity ratio reflects financial strength and stability, especially during downturns. It’s a key indicator of a company’s solvency and long-term risk profile.
🧮 Calculation
🎯 What does this mean for investors?
- Companies with high equity ratios are generally more resilient and less dependent on external debt.
- Low equity ratios can signal higher risk or aggressive financial strategies.
- Important: Always assess the equity ratio in combination with the return on equity (ROE). This shows not just how stable the company is – but also how efficiently it uses shareholder capital.
📘 Return on Equity (ROE)
📈 What is it?
Return on equity (ROE) shows how efficiently a company uses its shareholders’ equity to generate profit. In other words: how much net income is earned per dollar of equity.
🧮 How is it calculated?
🏛️ Why is it important?
ROE is a core profitability metric. It helps investors understand whether a company delivers attractive returns on the capital provided by its shareholders.
🧮 Calculation
🎯 What does this mean for investors?
- A high ROE indicates that the company is using its capital efficiently and profitably.
- It’s especially meaningful for capital-intensive businesses or firms with high equity bases.
- Important: A very high ROE can also result from high debt levels – always interpret it alongside the equity ratio to assess financial health.
📘 Return on Capital Employed (ROCE)
📈 What is it?
ROCE measures how efficiently a company generates profits from its total capital – including both equity and interest-bearing debt.
🧮 How is it calculated?
It evaluates the return on all capital employed, regardless of how it’s financed.
🏛️ Why is it important?
ROCE is ideal for comparing companies with different financing structures. It shows how well management uses capital to create value for both shareholders and creditors.
🧮 Calculation
🎯 What does this mean for investors?
- A high ROCE means the company uses its capital efficiently – regardless of whether it's funded by debt or equity.
- The higher the ROCE compared to peers, the more value the company creates with its invested capital.
- Especially relevant for capital-intensive sectors like industrials, energy, or infrastructure.
📘 Return on Invested Capital (ROIC)
📈 What is it?
ROIC measures how efficiently a company generates returns from the capital invested in its core operations – regardless of whether the capital comes from equity or debt.
🧮 How is it calculated?
- NOPAT = Net Operating Profit After Taxes
- Invested Capital = Operating assets minus non-interest-bearing liabilities
🏛️ Why is it important?
ROIC is one of the most accurate indicators of capital efficiency. Unlike return on equity, it is not distorted by leverage and shows how much value is created for all capital providers.
🧮 Calculation
🎯 What does this mean for investors?
- A high ROIC shows how effectively a company uses the capital that is truly invested in its core operations.
- Unlike ROCE, ROIC focuses only on the capital that is actively used to run the business – and that requires a return (i.e. interest-bearing).
- Especially useful when comparing companies with large amounts of excess cash or non-interest-bearing liabilities – giving a more realistic picture of capital efficiency.
📘 Leverage Ratio (Debt-to-Equity)
📈 What is it?
The leverage ratio indicates how much a company relies on interest-bearing debt (such as loans and bonds) relative to its shareholders’ equity.
🧮 How is it calculated?
🏛️ Why is it important?
This ratio helps assess a company’s financial structure and risk profile. High leverage can enhance returns – but also increases exposure to interest rate changes and financial stress.
🧮 Calculation
🎯 What does this mean for investors?
- A low leverage ratio signals financial strength and independence.
- A higher ratio can improve returns in good times but increases risk during downturns or rising interest rate periods.
- 👉 Always interpret in the context of industry, capital intensity, and interest rate environment.
📘 Earnings per share (EPS)
📈 What is it?
Earnings per Share (EPS) shows how much profit is attributable to a single share – and is one of the most important metrics for evaluating a company's performance.
🧮 How is it calculated?
The diluted share count reflects potential new shares that could be issued through options, convertible bonds, or other rights.
🏛️ Why is it important?
EPS is the basis for many key valuation metrics like P/E ratio, PEG ratio, or payout ratio. It enables comparisons of profitability across companies, regardless of their size.
🧮 Calculation
🎯 What does this mean for investors?
- EPS captures per-share profitability and is especially useful for comparisons over time or with analyst estimates.
- Rising EPS may signal consistent growth or share buybacks.
- Important: Always use diluted EPS for more realistic valuations – especially in companies with stock-based compensation.
📘 Free cash flow per share (FCF per share)
📈 What is it?
Free Cash Flow per Share shows how much free cash flow a company generates per outstanding share – after investments, but before dividends or debt repayments.
🧮 How is it calculated?
Free cash flow is calculated as operating cash flow minus capital expenditures (CapEx).
🏛️ Why is it important?
FCF per Share reveals how much real cash is available per share – useful for dividends, buybacks, or reducing debt. Unlike net income, free cash flow is harder to manipulate and often seen as a more reliable metric.
🧮 Calculation
🎯 What does this mean for investors?
- High FCF per share signals strong financial flexibility.
- It shows how much capital the company can effectively reinvest or return to shareholders.
- Particularly relevant for dividend payers and capital-efficient businesses.
📘 Short interest
📈 What is it?
Short interest indicates how many shares of a company are currently sold short – that is, borrowed and sold by investors who expect the price to decline.
🧮 How is it calculated?
It reflects the percentage of a company’s shares that are being shorted relative to the total shares available.
🏛️ Why is it important?
Short interest serves as a sentiment indicator: A high value may signal skepticism or bearish expectations – but also increases the potential for a short squeeze if prices rise unexpectedly.
🧮 Calculation
🎯 What does this mean for investors?
- Low short interest usually indicates market confidence in the company.
- High short interest can be a warning sign – or an opportunity if sentiment shifts.
- Especially relevant in volatile markets or ahead of key earnings releases.
📘 Employees
📈 What is it?
The employee count shows how many people a company employs worldwide – offering insights into its size, structure, and business model.
🧮 How is it calculated?
🏛️ Why is it important?
It helps assess operational scale, labor intensity, and cost structure. Combined with revenue and profit, it enables key metrics like revenue per employee or productivity.
🧮 Calculation
🎯 What does this mean for investors?
- A high headcount can signal operational complexity – but also significant growth capacity.
- Revenue per employee is a key indicator of efficiency.
- Especially useful for comparing tech, industrial, or service-heavy companies.
📘 Revenue per employee
📈 What is it?
Revenue per employee indicates how much revenue a company generates on average per employee – a key measure of efficiency and productivity.
🧮 How is it calculated?
The employee count is typically taken from the most recent annual report.
🏛️ Why is it important?
This metric helps compare business models – especially between labor-intensive and technology-driven companies. A high value suggests automation, operational efficiency, or strong value creation per head.
🧮 Calculation
🎯 What does this mean for investors?
- A high revenue per employee indicates a scalable and margin-strong business model.
- A low figure may reflect labor-intensive operations or lower value-add.
- Especially helpful when comparing tech companies to industrial or service sectors.
Friedrich Vorwerk Group Stock Analysis
Analyst Opinions
10 Analysts have issued a Friedrich Vorwerk Group forecast:
Analyst Opinions
10 Analysts have issued a Friedrich Vorwerk Group forecast:
Friedrich Vorwerk Group Events
Past Events
|
AUG
13
Q2 2026 Earnings Call
2 months ago
|
|
MAY
12
Q1 2026 Earnings Call
6 months ago
|
|
MAR
31
2025 Earnings Call
7 months ago
|
|
NOV
13
Q3 2025 Earnings Call
12 months ago
|
StocksGuide Free
Friedrich Vorwerk Group — Q2 2026 Earnings Call
1. Management Discussion
Welcome to the earnings call of Friedrich Vorwerk Group SE regarding the first half year figures of 2026. The company's CEO, Torben Kleinfeldt; and CFO, Tim Hameister, will guide you through the figures in a moment, followed by a Q&A session in which you have the possibility to place your questions directly to the management.
And with that, I hand over to you, Torben.
Yes. Thank you very much for the introduction. Myself, Torben Kleinfeldt, studied civil engineer. On board of Friedrich Vorwerk since 2001. Today, responsible together with my colleague, Tim Hameister, who will introduce himself later for the all responsibility of the company and I also do care still myself about some of our major projects in both pipeline construction and also plant construction.
To all of you who have been in this call for the first time, I will start with a very small and very short introduction to our group of companies. So Friedrich Vorwerk was founded in 1962. From its first day on, it has always been active in the energy infrastructure. So in the end, laying cables, pipeline systems, district heating pipelines and today, also large cable systems and hydrogen pipeline systems. Our branch offices are very well distributed in the north of Germany, as you can see on the map on the left-hand side with 50 locations and more than 2,400 employees.
We are one of the largest players for energy infrastructure here in middle of Europe. And due to the energy transition that is going on at the moment, especially in Germany, we had a strong annual growth over the last years of more than 30% per year.
Today, we are active in very highly attractive markets such as infrastructure for natural gas, electricity, over the latest years, also clean hydrogen and what we today call adjacent opportunities, which basically wraps up our activities in district heating, the treatment of biomethane and also the extraction of the CO2, transport of CO2 and storage of CO2.
Among our long-decade customer relationships are, of course, the large TSOs and the bigger district system operators here in Germany, both on the natural gas side and also on the electricity side. So to name some of the larger names, it's an Amprion, TenneT on the natural gas and hydrogen side, Open Grid Europe, Gasunie. But as you can also see, among our major customers are also petrochemical companies and also the large producers of energy and electricity, such as E.ON or Thyssengas, for example.
Yes, we have, as I said, major driver of our activities is the energy transition going on. And due to this, our total project volume acquired has been increased from 2024 to 2025 by almost 30%.
So what does Friedrich Vorwerk Group stand for and what are our what daily works are we involved? And I think this sketch is from an early days of our IPO, but it still shows very well which activities we are involved in. So for example, on the very top of this slide, you see our activities in natural gas.
So our company group is able to engineer, construct and also operate all belonging all necessary facilities that belong to a natural gas -- high-pressure natural gas. So it could start, for example, by setting and engineering an LNG terminal or a cross-border takeover station. Then of course, we are -- we have the main objective to construct and build the high-pressure gas pipelines, which transport the natural gas being taken over from an LNG terminal or a cross-border station and bringing it to either consumers or, for example, to underground storage facilities, which are well located here in the north of Germany.
To make the system of pipelines work, each 200 to 300 kilometers compressor stations are being required. So these are very sophisticated large pumping stations that will boost the flow of gas in the pipelines to finally bring it to the consumers and at the very end of the value stream, we can also engineer and set up gas pressure regulating and metering stations, which is, so to say, the interface towards the consumers where the gas is reduced in pressure. It will -- is responsible for delivering the right volume and also at this -- in these locations, the gas flow and the energy being transferred to the consumers is metered, so it can be later invoiced for all customers.
Basically, the same is true for future hydrogen grids, which are shown here on the bottom of this slide. So it requires also pipeline, compressor stations, storage facilities and also metering stations. But at the very beginning, of course, since hydrogen cannot be found in nature, it requires electrolyzers. So hydrogen can be produced out of electrical energy and water.
Friedrich Vorwerk has already been active in the hydrogen electrolysis since 2011 when we set up the first power to gas plant here in Germany for the E.ON Group. In between our activities in high-voltage underground cable systems, which the main activity starts with the landfall of seagoing cables, picking up the electricity from the offshore wind farms, which are installed in the North and Baltic Sea. These activities are mainly done by our sophisticated horizontal directional drilling services, which take over the underground cables and under the sensitive areas of the shores of North and Baltic Sea and bring it to onshore.
From here, we can run the underground cable systems to the next transformer or inverter station. And of course, we are also able to set up these sophisticated stations, but also able to set up power to heat station where the electricity can directly be transformed in heat, mainly to heat the households in the big cities and also the industry.
So after this general introduction, a short market update, what is going on in our markets. There are some new activities. And as I said in the beginning, in our adjacent opportunities, we are already today active in extraction of CO2 out of, for example, biomethane streams. And we have already a couple of weeks ago, placed an offer for the first commercial CO2 pipeline in Germany, which will -- if the project is realized, we will connect the cement factory in Lägerdorf, run by Holcim to the Port of Brunsbüttel, where the CO2 is loaded on the ship and then being shipped to Norway, where the extracted CO2 will then be dumped into old natural gas wells under the North Sea.
And just recently, an agreement between the Netherlands and Germany has been finalized that they are planning to export through the Delta Rhine Corridor, CO2 from major power stations and other industries towards the border of the North Sea in the Netherlands. And there, it will be picked up and then being transferred via pipeline to old natural gas wells in the North Sea and can be stored there for a very long period of time.
So this is really an activity which can be a very nice opportunity for our group of companies with up to the 2045 year when this project is really being kicked off and is realized.
Besides that, I know that a lot of discussions has been going on about our underground cable activities. So the German government has decided in 2016 that all major high-voltage cable systems need to be installed underground and not as before in aboveground power lines. Due to that new law, all recent planning have been done and also the investment volume, which is shown in today's national electricity grid development plan with a volume of EUR 320 billion up to 2045 is still based on that law. So all the current projects, which are being executed in high-voltage transport of energy here in Germany will be underground pipelines. But at the moment, due to the cost of the underground cable systems, discussions are going on in the German government to switch again to overhead lines. which could be feasible for some of the future projects that will be executed after 2035.
But in the end, there are for many projects which are in the grid development plan at the moment, there are good technical reasons, but they are being built underground as a cable system. So the discussion in the government is still going on. And as you can see from the slide, some of the federal countries in Germany, for example, Lower Saxony and Schleswig-Holstein, they have already strongly opposed to the discussion.
So we did expect to find a resolution with the German government by this summer. Since now we have not received any update, so we'll see what comes out of this.
In the very end. But as we say, in the very end, we are very sure that there are good technical reasons for underground pipelines. And in the end, the decision is being made by the TSOs for which technology they will decide. But besides that, of course, within our company group, a lot of tendering is still going on in all fields of activities. And this slide shows our project pipeline, which we are working on at the moment in our estimation department. So there are a lot of very huge projects in all markets which we are working on at the moment. Largest one in natural gas industries at the moment, the Spessart-Odenwald-Leitung, which is about 120-kilometer 40-inch pipeline in the southwest of Germany being executed in the years '27 up to '29.
Other projects which will be used for natural gas over the next years and then later be converted to hydrogen, for example, the Gasunie project ETL 186, which will end in Peine, where the Salzgitter AG steel factory will receive in the later 30s hydrogen for their steel production.
But also pure hydrogen pipelines are being worked on at the moment. So for example, the Delta Rhine Corridor, which will carry both hydrogen and also CO2. The H2ercules project, where we have already received 2 small contracts for Open Grid Europe to set up a 56- and 40-inch pipeline. And also here another Gasunie project, the ETL 187, where we have handed in our first offer beginning of July this year.
In electricity, major projects reaching out up to the year 2034 is Windader West, SuedWestLink, SuedOstLink+, and NordOstLink Section 2, which is run by 50Hertz. And also in the region of adjacent opportunities, there will be large projects coming up, for example, the Lägerdorf-Brunsbüttel link, which I've talked about before and also a large water transport line, which will carry water from the river of Rhine when it carries enough water and then fill the coal mines being left over in the Western Germany.
So these are projects we are working on or the major projects we are working on at the moment in estimation environment. But please keep in mind that these projects are only the few major projects we are working on at the moment. Our company group executes more than 500 projects a year. So among those are, of course, also a lot of smaller projects being executed for the DSOs and other customers.
And with that, I would like to hand over to Tim for the financial section.
Yes. Good afternoon, ladies and gentlemen. Welcome to Friedrich Vorwerk's earnings call on the H1 figures. My name is Tim Hameister. I'm the CFO of Friedrich Vorwerk. And I'm very pleased to walk you through our, again, exceptionally strong half year results and the updated outlook.
So following a modest start to 2026 in terms of revenue due to unfavorable weather conditions, we returned to our targeted growth trajectory in the second quarter. As a result, monthly revenues increased each month from April to June, with June achieving the highest monthly revenue to date at EUR 73 million. In total, we generated revenue of EUR 198 million in the second quarter, representing growth of 17% compared with the previous year. As in the previous years, a key driver of this continued growth is the increase in our workforce. Although we had originally intended to take a slightly more measured approach to recruitment this year, we were nevertheless able to recruit more than 160 new employees in the first 6 months on a net basis, representing a 15% increase in the average number of employees compared with H1 2025.
In terms of revenue breakdown, the electricity segment was once again the strongest, accounting for 53% of total revenue, followed by natural gas at 29% and our adjacent opportunities at 16% Clean hydrogen revenue was still quite weak in the first 6 months. However, we continue to expect strong growth in this area, not least due to the large orders already received in Q1, the 2 major plant construction projects, Bobow and [indiscernible]. And in Q2, where we secured the H2CoastLink pipeline project, which we see later in the presentation, but also due to the very attractive project pipeline related to the hydrogen core grid.
Furthermore, since the start of the year, we've been also reporting what is known as production output, which in addition to revenue includes the proportionate revenue from our joint ventures, Arbeitsgemeinschaften. As the contract structure had shifted increasingly towards these joint ventures over the last 2 years due to the growing scale of the project, we believe this key figure provides a more transparent view of our business performance.
In the first half of the year, the production output improved by 35% to EUR 448 million, representing significantly stronger growth than revenue. Looking at the breakdown by segment, it's clear that a very large number of joint ventures has been formed, especially in the natural gas segment. However, profitability showed particularly strong growth in Q2. EBITDA increased by 68% to EUR 60.8 million, corresponding to a margin of 30.7%, which represents a quarterly record for Vorwerk in both absolute and relative terms. The EBIT margin rose by 9 percentage points to a new record high of 26.7%, corresponding to EUR 52.8 million alone in Q2.
And the key driver behind this fantastic performance is that we've managed to substantially reduce the cost of materials ratio whilst turnover has risen significantly. In other words, fewer materials and subcontractors were required to deliver our services.
The cost of materials were reduced by EUR 10.7 million compared with the previous year, resulting in an improvement in the cost of materials ratio from 46.4% to 38.6% in the reporting period.
Expanding our own value chain remains, therefore, a key part of our growth strategy. Yesterday, we were able to announce the acquisition of a former supplier called meterQ. Torben will provide further details on this acquisition later on.
Another reason for the improvement in profitability is the sharp rise in earnings from joint ventures, which more than tripled to EUR 12.8 million in Q2. Accordingly, we generated EBITDA of EUR 92.6 million in the first half of the year with a margin of 27.4% and EBIT of EUR 67.9 million. In addition to the effects on profit described previously, these results also include a positive one-off effect in the amount of EUR 1.7 million from the sale of our former branch office in Lüchow-Dannenberg in Q1 this year. So let's now turn to the order situation.
On the left-hand side, we can see the conventional order intake figure, which has improved by just under 50% year-on-year to EUR 321 million. On the right-hand side, we can see the total project volume acquired, which also includes a proportionate share of the order intake of the JVs. And this figure shows actually a decline of 25% to EUR 470 million, which is due to the fact that, especially in Q2 2025, a number of new large projects were secured in the form of joint ventures, such as the SuedLink project and the South German natural gas pipeline.
Overall, we are quite happy with the order situation. This is a very satisfactory development with a book-to-bill ratio above 1 in terms of the total project volume acquired versus production output.
Despite the high turnover, respectively, the production output, the order book remains at a high level and has even increased slightly compared with the balance sheet date. As of June 2026, around 45% of the order book relates to the electricity segment, followed by 30% for natural gas and already 14% for hydrogen.
Then also look at the balance sheet, which remains very healthy, very strong and also relatively unchanged compared to December 2025. Again, we have continued to invest into our noncurrent assets such as drilling equipment and especially the welding equipment for our subsidiary, 5C-Tech, which is growing at a very high speed. For seasonal reasons, working capital increased compared to the end of the year. However, the working capital management, which was and still is a key priority for us has achieved continued positive results.
Therefore, our net cash position has been -- has improved by outstanding EUR 128 million compared to Q2 2025, underlining our high cash conversion rate.
And due to this fantastic performance, especially in the second quarter, we revised our guidance for the 2026 fiscal year upward last month. We now expect EBITDA in the range of EUR 180 million to EUR 200 million after previously forecasting EUR 160 million to EUR 180 million. We continue to expect revenue in the range of EUR 730 million to EUR 780 million. And this forecast is based solely on the company's organic growth and does not include any additional inorganic growth opportunities.
However, given the net cash position of EUR 212 million as of June, the range of opportunities for further growth options remains definitely open.
And let me now hand it back to Torben for some updates on the ongoing and upcoming projects before we open the floor to your questions.
Tim, thank you very much. And after these fantastic figures, I think I will present some very nice projects we are working on at the moment. Some of the projects we have already introduced to you in the Q1 earnings call. So largest project at the moment is the -- actually 2 projects. It's the gas pipeline system, ETL 182 and ETL 179, which we have started working on in the fall of 2025, preparing preliminary works as the pipe storage facilities, you can see on the bottom of this slide.
We have now started with the construction and laying of the actual pipeline. So welding is in full progress on ETL 179. We already finished all the crucial non-dig procedures. So all the large crossings in terms of horizontal directional drilling, micro tunnels and also direct pipes have been successfully executed in the time frame given by the customer. And for the 179, which has been handed over to Gasunie, by the end of this year to allow further transports of LNG via the floating terminal in Stade. This can definitely be met by the activities we are doing in the field at the moment.
For ETL 182, also here for all the major projects, we are in the time line given by the customer and by our project group. So we are at the moment quite happy with the execution of these 2 projects. Also after a very slow beginning due to weather conditions here in the north of Germany, we had a fantastic weather opportunity over the summer months and did a very good performance on both of the projects.
Coming to a next pipeline project, which is a pure hydrogen pipeline project. It's a diameter-wise smaller pipeline with 16-inch diameter pressure load will be in -- or design pressure of the pipeline will be 100 bar. The customer for this project is EWE NETZ and GTG Nord, which are one of the 2 smaller TSOs here in the north of Germany.
We are constructing a pipeline to connect the newly built electrolyzer with a total capacity of 320 megawatts, which will be set up in the area of Emden, so the North Sea port of Emden and will pick up the produced hydrogen at the electrolyzer facility and then transfer it to a section of pipeline, which will later on feed some industry in the region of Leer and also the storage facilities in Jemgum and Nüttermoor, which are already been -- which are also being run by a subsidiary of the EWE AG.
So this project at the moment is still in engineering and preparation phase. Work on this project will start probably in Q3 this year. Next project, again, a natural gas project, which is a project that was won by our subsidiary, 5C-Tech, so our newly set up welding technology company. We have received a contract to execute 28,000 welds with a diameter of roughly 1,100 millimeters to set up a gas -- natural gas pipeline transferring Kazakian gas towards the border of China. At the moment, we have done all preparational works. We have executed the welding procedures. And now at the moment, all our specialized equipment is being shipped to Kazakhstan. And once it will arrive there, our expert team will set up the system with our customer and then start executing the welding activities also in Q3 '26 with an estimated duration of roughly 8 months.
Since 5C-Tech has already executed very successfully similar projects last year in Iraq, we are very happy to have won this 2 million digit project for our new subsidiary.
Also a new company in the group is the meterQ company. This company is located in Friedberg, close to Frankfurt am Main.
Company has been active in the field of gas analysis. So they can do both gas quality analysis, both in natural gas, and they are the only supplier of this equipment, which has been certified at the moment for hydrogen. The plants which are being produced here, you can see on the bottom right hand of this slide. And we are very happy that we could take over all the assets of meterQ, and we have integrated those assets in our subsidiary VORWERK Gas Technology GmbH, where we have already located our activities for flow metering with our system OrQa, which we've introduced already a couple of years ago. And to putting the OrQa and also the gas chromatography together, we are also able not only to meter flows and quantities, but now we can also meter the quality of the gas being transferred and therefore, can also do the calculation which energy is being transferred to the customer with own equipment, and we can offer a full solution in this area of our activities.
We have already integrated those pieces of equipment in our activities in Bobow and [indiscernible], so both major gas metering and gas and reduction stations, which we are working on at the moment for our customer ONTRAS.
With that, also 15 very high qualified new employees came on board. And as Tim already elaborated before, number of employees has already grown quite by a significant number by the first half year of 2026.
So headcount on the 30th of June 2026 is more than 2,400 employees, which is a rough growth of 7% of the employees from beginning of the year. So I think we carry on like this, we'll probably this year also be managing to grow by 10% headcount. And although we figured we would take it a bit slower this year with the growth of headcount due to the large project volume we are operating on at the moment, I think it is necessary to get some new and also very well-trained people here on board.
So coming to that, I think it's the end of our presentation, and we are very glad to listen and we'll be ready for all of your questions.
Thank you very much for your presentation.
[Operator Instructions]
Lasse Stueben, the stage is yours.
2. Question Answer
I wanted to ask just generally on sort of the outlook for order intake in the second half. I know you gave some projects in the presentation, but just given how quickly you're growing, I'm guessing that winning more orders now is going to be of the focus for the second half and also going to '27. So just curious about how you're thinking about that also in light of the I'm guessing we'll have some project delays on the electricity side of things until we get clarity on the legal framework.
The second question is on A-Nord. We're nearing, I guess, completion here in '27. So just wondering how you're thinking about the kind of provision for the bonus-malus scheme that you've built up? And then finally, maybe you can talk a little bit about how the business has developed so far in Q3. I'm guessing the weather has been pretty good, maybe even too hot in some parts, but it would be good to just get an update on Q3.
Well first of all, at the moment, we do not really see a delay of tendering activities in the electricity market. As I tried to explain before, the major projects set up for the high-voltage electricity grid is still unchanged on the way. So all major projects which are planned to be executed up to the year 2035 will remain with the underground cable system.
Most of -- for most projects, the cables have already been acquired and also most of the permitting is also on the way. So it is very hard for the customers to change these projects since they already did large investments, as I said, in the cable procurement. So we do not expect any delays here, except from usual delays, which we see in all project tenderings, which could happen, but that only slows down the projects 1 or 2 months.
In the end, we do expect that all the projects we did show on the pipeline slide will show up in our estimation department over the next month. I think especially for the large pipeline systems, we feel very confident that we are able to get some further pipeline projects on board, although please keep in mind that we are still very, very well booked for the next year. So '27 will be still with the work that we have at the moment, a very busy year for us. But there are, of course, still a couple of interesting projects coming up, which we would like to tackle for the execution late '27 and '28. And Tim, maybe you want to catch up with the A-Nord?
Sure. In late Q2, we were able to agree with the client on an adjustment to the bonus-malus related targets related to the delays we have seen in the project. Yes, this agreement was finalized in Q2, but has not yet been factored into the project assessment. which means that there is no adjustment effect in the Q2 figures. And I think this will be done by Q4 at the latest. The remaining contract volume as of June 2026 is roughly EUR 100 million for this project, which will be worked through until summer 2027. And regarding start into the Q3, we were pretty happy with the July. As you said, we had pretty good weather conditions on all on our project sites and branch offices. So yes, it was a good start.
Lasse, did that answer your question?
Yes. Thank you very much.
And we have a look in the chat with the questions. Could you elaborate on your perspectives around data center build-ups and connections?
Yes. Potentially, we could be active in all sorts of activities around the data centers. Of course, they do require a lot of electrical power. So potentially running underground cables to these locations is work that we do see in the future, but also backup power in forms of hydrogen generators or fuel cells can be potential work for our plant construction department. We were already engaged in a couple of projects where we did some engineering task. But in the end, here in Germany, we have not seen real projects with data centers where services like backup power and grid connection has been tendered out so far.
Thank you. And suppose the state elections in September lead to resignation of the German chancellor and snap elections, would this have an impact on for, for example, delayed approvals?
No. Since the acting government is not responsible for permits and approvals of infrastructure projects. It is done by the federal municipalities and the federal government, we do not expect any delays in the project. Well, of course, there are always delays in terms of permitting, which is in the end, the responsibility of our customer, but that will not really be affected by a change in government. What, of course, could happen that the energy politics are being swung in a different direction. But this is an effect that could, of course, always happen, which we are not really afraid of in the end, since we are active on all energy markets, we are not really afraid if we see more gas-powered units or we see more natural gas or more hydrogen. We are very flexible. We can shift our workforce very flexible from one to the other market. We can also shift our machine resources very flexible, for example, from cable projects, pipeline projects. So we are pretty much relaxed in which direction the energy transition in Germany would go.
And 2 questions regarding EBITDA. The EBITDA guidance for the year implies a soft H2 margin declining compared to H2 2025. Could you provide more color on this matter?
Well, at the upper end of the EBITDA guidance, this would result in an EBITDA of EUR 107 million compared to EUR 93 million in H1. So still a significant improvement in absolute EBITDA. And we not really think that EBITDA margin is still the right KPI given the higher share of JVs, which have an impact on the margin side. So I would ask you to look more at the absolute -- the growth of the absolute EBITDA. And in this case, I think with the current guidance we have, this is still quite ambitious, but very good manageable.
And the EBITDA margin has improved significantly while the revenue share from A-Nord is declining. What portion of this margin improvement do you consider sustainable? And what level of EBITDA margin do you regard as realistic for 2027 and beyond?
Well, given the special contract structure and remuneration scheme we had with the A-Nord project, that was -- had a dilutive effect on the margin of the group. So the revenue share of A-Nord is decreasing from quarter-to-quarter, which has obviously a positive effect on the group margin level. But again, this is more better to look at the growth of the absolute EBITDA.
Thank you very much. And that was our last question so far. Ladies and gentlemen, if there should be any questions left, please let us know.
And if this is not the case, we have one more question. 5C. What is your long-term revenue and margin target for 5C? Can you walk us through your thinking? How scalable is the 5C business model? What are the current bottlenecks, demand win rate or projects available, supply constraints?
Yes. What we love about the 5C-Tech business is that it is very scalable because we are not relying on that many employees. We can just build more robots and bring them to the projects. And this is what we have already seen in the figures so far. So for example, we finished last year with around EUR 3 million in revenue in the first year of operation. This year, we expect to see more than EUR 20 million in revenue already. And I think on a midterm perspective, the company can reach around EUR 50 million yearly revenue. And we already said that we expect that the margin level of this business can be even higher than the current group average.
Thank you very much. And the last question regarding where can we find this recording.
We will put the recording on the airtime platform afterwards and also send it to Friedrich Vorwerk where you can ask Investor Relations and in this case, Torben and Tim for it.
Ladies and gentlemen, if there shouldn't be any questions left, we will come to the end of today's earnings call. Thank you very much for your shown interest in Friedrich Vorwerk Group SE. A big thank you also to you, Torben and Tim, for your time and your presentation.
Should you have any questions at a later date, ladies and gentlemen, please reach out to Friedrich Vorwerk. I wish you all a successful day around the world and handing back over to Torben for some closing remarks.
Yes. Also from my side, thank you very much for listening today. I think we still have a great year ahead of us. And so stay with us, and let's get back to work, I would say. Have a good afternoon.
Friedrich Vorwerk Group — Q2 2026 Earnings Call
Friedrich Vorwerk Group — Q1 2026 Earnings Call
1. Management Discussion
Welcome to the earnings call of Friedrich Vorwerk Group SE regarding the Q1 figures of 2026. The company CEO,
Torben Kleinfeldt and CFO, Tim Hameister, will guide you through the figures in a moment, followed by a Q&A session via audio line and chat. And with that, I hand over to you, Torben.
Yes. Thank you very much for the introduction and also a very warm welcome from my side. Welcome to the Q1 earnings call, 2026 of Vorwerk Group SE. As always, I would like to start up with a short summary of what is happening within our company's group and also with a short market update, then I would hand over to Tim for the financial figures. I would then give you at the end an overview of running projects which we are executing at the moment.
So first of all, Friedrich Vorwerk is active since 60 years in the business of energy infrastructure. Our main markets focused here on the top right of this slide is the natural gas market, electricity market, clean hydrogen market and adjacent opportunities, whereas the adjacent opportunities is mainly our activities in heating, district heating grids and stations, but also biomethane treatment and CO2 separation and transport.
Today, I would still like to show you this slide, although probably most of you know it or have seen it for a couple of times, but there is some change in the composition of our 15 locations. As you have heard, we have sold our property in Lüchow-Dannenberg, where the activities have mostly been taken over from our headquarters in Tostedt. And we have opened up a new facility in the Netherlands called Houten, which is the main office for 5CTEK, our company for our welding technologies. And from Houten, we will guide our international activities in terms of delivering welding services to our customers.
Besides that, still most of our customers are from the TSOs and DSOs. So main customers are on their natural gas and hydrogen site, Open Grid Europe, Gasunie, ONTRAS Gas Transport and on the electricity side of the business, it's TenneT, Amprion, 50Hertz which are among our major clients.
Growth of the company group has still been driven by the energy transition going on year in Europe and looking back on the year '25, we did a great job acquiring more projects. So total project volume acquired in '25 was almost EUR 1 billion to be exact, EUR 991 million, which is a rise of almost 1/3 compared to 2024 figures. And as you know, the total project volume acquired also takes into account our share in the joint ventures we are operating on many projects. Yes, that's for the status update.
And now I would like to change over to the market update. So besides all political discussions going on at the moment, many countries in the EU are still planning massive projects in terms of the energy transition. So the European Commission has just published in late April, the new list of PCI, PMI projects, which also focuses on infrastructure projects, which cross borders between European countries. And from the map, that is highlighted from the European Commission, you can see more than 230 cross-border projects. For example, in smart grids, electricity transition lines but also hydrogen projects and also projects for the transport of CO2.
Projects are shown there are in various statuses. So for example, you will find a Hyperlink project which is operating by Gasunie where we are already active in or H2ercules, which is the core grid projects of Open Grid Europe, where we have also received the first project to execute in the next years. But other projects like AquaDuctus or HyPipe Bavaria are still in tender phase, so permitting phase is ongoing, and execution will be in the next 5 to 10 years. But also other projects are highlighted in this map. For example, export routes of CO2 to Norway. These projects are still under investigation or they published the first project ideas.
So whoever is interested in what is going on in the next 20 years in Europe, I think the map of the PCI, PMI projects of the European Commission itself is a good for us to look at. Yes, but not only in terms of transport grids, there's a huge upgrade in demand, but also there's a huge step in investments in the distribution grids. So the ACER has conducted a survey among the DSOs, so among the distribution system operators in Europe to find out how the investments in the electrical distribution grids are developing in all of Europe.
And as you can see from this graph, there's a huge step up over the last 5 years of almost 80% in investments in the distribution routes. And of course, also, Germany is leading here because Germany is really focusing on new -- I'm sorry, so, yes -- sorry, that was a call coming in. So especially Germany is focusing on developing the distribution grid to get more charging infrastructure and new heat pumps to the households.
And besides the investment in the distribution infrastructure, there's, of course, still a discussion going on in Germany about transport infrastructure, especially in electricity. As you've probably been known that since 2016, Germany has passed a law to move all transport electricity infrastructure underground, so not using overhead power lines, but undergrown cable systems to transport the energy. And now this year, the new government has drafted out new law that will change the Cable Law, which has passed in 2016, and they want to move more power lines above ground again due to cost issues. Of course, this bill has not been passed by the government yet.
And also the next project in electricity, especially the large north, south and west, east corridors, they have already been planned and permissions have already been granted. In some cases of projects, the cables have already been procured. So we do not see a change in outlining these projects, at least not for the next 5 to 8 years. What happens after that will be a point of political discussions.
But in the end, just to give you a technical idea also on the advantages of underground power systems, of course, it creates better acceptance with all the stakeholders that are influenced by the projects. The underground power lines are more resistant to weather issues and also for terrorist attacks. So there are also some electrical issues where using cable systems is more advanced, especially in transport losses compared to the above ground power lines.
So we do not see any changes here for the upcoming projects, at least not for the next 5 to 8 years. And therefore, we are very comfortable that our cable laying services will be required for the upcoming project without any changes.
And with that, I would like to hand over to Tim for our financial figures.
Yes. Thanks, Torben. I would also like to welcome you to today's earnings call on our first quarter figures. Let me now take you through our financial results in more detail, and as usual, at let's start with the top line.
As we already flagged, the first quarter was significantly more challenging in terms of weather conditions than in recent years. In January and February, there was a particularly heavy amount of frost and snow in northern Germany, meaning that work at some of our sites and projects had to be paused in February or could not even begin after the scheduled winter break. This makes it all the more pleasing that we still managed to increase revenue by 5% compared to the previous year, bringing it up to EUR 139 million.
Contributing factors here included, in particular, a very strong growth in headcount over the past few quarters as well as in the current quarter, during which we increased our workforce by almost 4%. And had a very strong performance in March, which allowed us to partially offset downtime for February already.
In terms of revenue breakdown, the electricity segment was once again the strongest, accounting for 56% of total revenue, followed by natural gas at 26% and our adjacent opportunities at 16%. Clean hydrogen revenue was still quite weak in the first quarter. However, we continue to expect strong growth in this area, not least due to the orders already received in Q1, but also due to the very attractive project pipeline related to the hydrogen core network which we outlined in recent calls.
However, our profitability showed particularly strong growth in Q1. EBITDA increased by 75% to EUR 31.8 million, corresponding to a margin of 22.8%. It's already nearly achieving -- reaching the level achieved in exceptionally strong fiscal year 2025. EBIT nearly doubled to EUR 24.1 million, corresponding to a margin of 17.3%. This strong increase in margins is attributable to several factors.
First, we achieved modest revenue growth while simultaneously reducing material expenses by approximately 20%. This is due to a shift in the project mix as Q1, 2025, now included a high proportion of revenue from material deliveries such as the cable protection pipes for our major project A-Nord and revenue in Q1, 2026 on the other hand, was generated with a higher proportion of in-house work, which compared to, let's say, simple material deliveries, naturally leads to a higher margin.
Second, earnings contributions from joint ventures increased from EUR 1.5 million in the prior year to EUR 4.1 million in the reporting period due to the higher order volume handled by the JVs. Third, the earnings figures include a positive onetime effect of EUR 1.7 billion from the sale of our former branch office in Lüchow-Dannenberg.
Let's now turn to the order situation. The top 2 charts here on Slide 2 show the standard metrics of order intake and order backlog. Order intake in Q1, 2026, increased by EUR 110 million to EUR 192 million, even though no major projects were awarded in Q1. Ultimately, this order intake was achieved exclusively through small and medium-sized projects worth up to EUR 50 million each. We do not typically prevent these projects in the project pipeline due to their respective sizes, but the total value of these projects can be quite significant and meaningful.
Among the larger orders received in Q1, there are 2 gas pressure regulating metering stations, one of which is already designed for the use of hydrogen as well as additional hydrogen pipeline projects. The 2 charts below show corresponding figures, including the proportion of order volumes of the joint ventures. Total project volume acquired rose by 50% to EUR 196 million and is only slightly higher than order intake, as no major projects were awarded in Q1. And accordingly, no new joint ventures were formed in Q1.
New, however, is the key figure is the backlog, including joint ventures, which we are reporting for the first time this quarter. This figure rose by 14% to EUR 1.4 billion and includes not only the conventional order backlog, but also the proportionate share of JV orders. In this context, we've also published a so-called production output figure for the first time, which rose by 14% as well in Q1 and also includes the proportional joint venture revenues. This should now provide all relevant key figures to form a complete picture of the company's situation, taking into account the shift in the order structure towards more JVs.
Based on the current quarterly results, we confirm the guidance for fiscal year 2026, which we published in March and which projects revenue in the range of EUR 730 million to EUR 780 million and EBITDA of EUR 160 million to EUR 180 million. But please keep in mind, this forecast is based solely on the company's organic growth and does not include any additional inorganic growth. Given the net cash position of EUR 232 million as of quarter's end, the range of opportunities for further growth remains definitely open.
Yes, let me now hand it back to Torben for some updates on our ongoing projects and upcoming projects before we open the floor for your questions.
Torben, you have to unmute yourself with a click on your microphone.
I'm sorry. So yes, thanks a lot, Tim. And today, we have chosen to focus really on our largest projects going on at the moment. So the first one would be the Corridor A-Nord, which probably most of you have heard of. Within this IPA project, Bohlen & Doyen is responsible for about 40% of total project volume. Actually, the lots being executed at Lower Saxony, progress, especially over the winter has been quite good on the project. The first lot within Lower Saxony have already been completed. We are quite happy with the progress also in terms of all closed crossings we have to execute. So all resources in terms of horizontal directional drilling have been busy over the winter, and this project definitely contributed a lot to the overwhelming Q1, 2026.
Next project is not from electricity market, but from natural gas market. It is our combination of 2 ETL pipeline projects, which are executed for the customer Gasunie Germany. The 2 projects compromises (sic) [ comprises ] of 1 pipeline, ETL 182 with a length of 86 kilometers and a diameter of 1.4 meters and a smaller pipeline called ETL 179-200 with a diameter of 900 millimeters, which will tie into the larger pipeline system at a location called Dieksum. Both projects are executed in a joint venture with PPS and Habau Group.
Project has already started last year with preliminary works. So we prepared pipe yards. The customer already delivered most of the necessary pipes. You see a picture of one of the pipe yards on this slide. And in March this year, the main activities on both projects have been started. We are especially happy that two of the, in total four very complicated drillings, have already been executed successfully, actually, a bit ahead of time. So we are also here quite satisfied with the progress of these two major gas installation projects.
Next project is from hydrogen market. We've received order from ONTRAS Gas Transport to plan and erect gas metering system and regulating system at the location of Bobbau, which is a major compressor station within the grid of ONTRAS Gas Transport. Here, we will deliver in this year and beginning of next year, mainly engineering services and procurement services for the project and then we'll start with the actual execution of this mid-two-digit million project beginning of next year.
And besides this, adjacent opportunities are also going quite well. The Friedrich Vorwerk Group is active in numerous district heating projects all across Germany. Major project at the moment is, again, in the city of Hamburg, where we are executing a major district heating pipeline connecting the waste to energy plant at Rugenberger Damm to the main grid of Hamburg. Pretty much similar projects executed at the moment in Leipzig. It's called the so-called REFILL project, connecting industrial facilities to the main district heating grid of the City of Leipzig.
This project will still be going on this and the next year and it compromises (sic) [ comprises ] of roughly 12 kilometers of newbuild district heating pipe, DN 700 and DN 900. But also a lot of renewing work is going on in terms of district heating grids. So our branch in Berlin is at the moment active at the Berliner Zoologischer Garten to renew a couple of old district heating pipelines, DN 500, 400 and 600 only over a short distance, but still it's quite a challenging and big project for our branch office in Berlin.
So that's it for the update on our projects. I'm really happy and excited about the first quarter, and I think we are up for a great year '26 so far. When the weather stays good, which at the moment, it looks like, I think we will have a great year in front of us. So please stay with us, and we are ready for your questions.
[Operator Instructions] And we do have the first 2 hands up. Lasse Stueben, please.
2. Question Answer
Just to confirm on the Erdverkabelungsgesetz. So it feels like this was a bit of a nonevent in the short term. Is it fair to say that, I think you said no projects kind of impacted earlier than 2032 or 2035. If you could just give some more color on kind of the near-term impact of that law should it be passed?
And then the second question would be just around sort of how the business has done so far in the second quarter. It looks like the weather has been much better. So just wondering about the phasing of revenues throughout '26 and whether there's anything unusual just given sort of maybe Q1 was a bit weaker than it has been in prior years? And then finally, the headcount additions of 4% in the first quarter. Is this roughly the run rate you're targeting for 2026?
And then finally, just on the M&A front, if you have any sort of extra sort of information you can give on what you're looking for, if you're close to anything on the acquisition front?
Maybe I'll take the first part of your question in terms of underground cable systems. So for the upcoming projects, say, up to 2030 to 2032 for most of the projects, permission procedures are on the way. And these permissions are all based on earth cables. For some of these projects like Wind At West and others, at least a part of the cables are already pre-procured. So we do not see in terms of cables have already been purchased or ordered and permission process is already ongoing, that there can be a change in these projects because that would mean a total stop to the projects.
The permitting procedure had to be reestablished from hour 0, so to say, so there would be a large fallback in the timeline of these projects. So I do think that at least for the next projects seen in the grid development plan, there will be no change from the cable systems. We have discussed it before that for the future projects, so the second wave being executed in the years 2032 and after, it is feasible that some of the projects could be executed by overhead power lines, although there are still technical issues, which do have a strong advantage on the side of the cable systems, for example, losses in the transitions are much lower than in overhead lines.
So that probably needs to be discussed in details with each TSO and the final decision, he doesn't make on the technology he uses, but for the next years, I don't -- do not see any impact if the law's passed. I mean we've already seen that, for example, Schleswig-Holstein and the Federal Country of Lower Saxony, they've strongly post to this idea. So we'll see what comes out in the end and if this bill is in the end passed, we don't know yet.
I will then take over the remaining questions from Lasse, to start with the Q2 question, apart from the relatively weak start in terms of weather conditions to the year, we expect to see a regular year in terms of the seasonality of the business. Also April in terms of weather conditions was quite normal compared to recent years. So we will see increasing revenue in Q2, Q3 and then the reduction in revenue in the last quarter, depending on the weather conditions in December.
If we go regarding headcount growth, if we just take the 4% in Q1 as a basis for the next quarter then we would end up with another 15%, 16% headcount growth for the third year in a row, which we definitely don't intend to do. As we've communicated before, we would see it more sustainable to reduce the speed of hiring this year so that we will end the year with like 6% to 8% headcount growth in total, meaning that the speed of hiring will definitely slow down in the next quarters.
And yes, regarding M&A, we currently have various targets on the shortlist, which we are at different stages. These range from small add-on acquisitions that gives us access to either new regional markets or new technologies to further expand our own value chain or to larger companies that are mainly an interest for us due to their workforce we can integrate into our projects.
Thank you for your questions, Lasse. [Operator Instructions] And with that, we're going on to Luyda Schumacher.
My question is also on the cable law. I mean you did say it's unlikely to have an impact on you for a long time. I'm interested in the background to the, well, potential change of the law. I mean, my experience is that in Germany, high voltage lines are either underground or they're not going to be built. So what is driving the political drive to change the law? It doesn't seem to make any sense other than maybe demonstrating that somebody somewhere is thinking about cost, but I think the reality is still that if you want new high-voltage lines, they just have to be underground.
So what is the motivation behind it? And is there a chance that maybe we are going to get a sensible outcome where they're saying, "Well, you know what? We thought about it, and it's just not practical to seek a change in the law". What is the timeline there? When are we going to find out if the law will pass or not?
Well, first of all, a good point. I mean, we still need to distinguish between transport grids and distribution grids. So I think for the distribution grids, we do not have a discussion within Germany, we will not go back and tie the electrical lines in front of our houses. So that will undoubtedly be underground systems. And if we look at also the volume, which goes into the distribution grids, it's just still sheer project volume in underground cable for the distribution grid. Of course, cost is an issue for transport power lines. It is estimated that an underground system is 5 to 8x more expensive than above-ground power line. So that, of course, also triggers politicians to look into it.
But in the end, I think before that bill really passes, it has to pass the Bundestag, then also the Bundesrat. If you look at the Bundesrat, Schleswig-Holstein, so all the northern federal countries have already strongly opposed to changing this law. So even if it passes the Bundestag, it is not 100% sure that it will also pass the Bundesrat. I'm not sure about the political timeline to pass that law. Probably we'll see more before summer. And in the end, it is then to each and to each individual TSO to decide what technical system is the best.
And if it gets approved by the grid development plan, so by the Bundesnetzagentur, since all or most of the next projects have already been approved by Bundesnetzagentur and are also confirmed in the grid development plan, we do think even if the law changes, no change for upcoming projects.
And then what is your best guess as to the political motivation behind it, because with grid security...
Reducing costs for the energy consumers. Reducing costs for the energy consumers because they have to pay for the grid extensions.
Okay. And if infrastructure just doesn't get built, we can all celebrate savings, but you don't worry about the consequences. Is that right?
Yes.
Thank you, Luyda, for your questions. And we are moving on to the questions in our chat box. Was the strong order intake in Q1 more of a one-off effect or do you currently see a general acceleration in contracting activity?
Well, as Tim already elaborated, we didn't have an order intake of major large-scale project. It was a lot of district heating, small, medium-sized projects, not only from district heating, but in the end, from all markets. And I think it does show a tendency that both in distribution and also in transport grids, there are a lot of activities, not only in major projects, but also in smaller to medium-sized projects that need to be executed. And I think in the end, it does show the huge demand, which is really driven by the energy transition.
Thank you. And the last question for now, ladies and gentlemen. [Operator Instructions] There is much excitement in the U.S. for Enhanced Geothermal Systems, EGS. Over time, can you drilling technology and value -- add value to this industry?
Well, in the end, our drilling technology is horizontal directional drilling. If you are looking for geothermal power, also in Germany, you need to do -- execute deep drilling. If you look at the different landscapes here in Germany, the bores need to be at least in the northern Germany between 5,000 and 6,000 meters deep to get the real -- the warm water out of the ground and use it for heating purposes. These very deep drilling are very cost intensive.
And that's we have looked a couple of years, I think 10 or 15 years ago, we looked into these projects, but the risks of finding the right horizon where you can extract heat from the ground has a very high risk, and the investments are just huge. So at the moment, I do think our horizontal drilling technology will be core for boring infrastructure in a no dig way. So in a non-open cut way, and that is the main focus of our technology. So I think this technology will not be used for geothermal power plants.
Thank you very much and this is it for now. With no further questions, we have come to the end of today's earnings call. Thank you very much for your interest in Friedrich Vorwerk Group SE. A big thank you also to you, Torben and Tim for your presentation and your time.
Should you have any further questions later on, please feel free to contact Investor Relations. And with that, I wish you all a successful day around the world and handing back over to Torben for some final remarks.
Yes. Thank you very much for listening today. To be honest, I'm very happy with the Q1 we had so far. I think we haven't had a stronger Q1 so far in company's history at least as I can recall it, Hopefully, this year goes on like this. And if weather is with us, I think we'll come out with a very strong year 2026. And I'm really delighted to join this with you. Have a good week.
Friedrich Vorwerk Group — Q1 2026 Earnings Call
Friedrich Vorwerk Group — 2025 Earnings Call
1. Management Discussion
Welcome, ladies and gentlemen, to the earnings call of Friedrich Vorwerk Group SA regarding the full year figures of 2025. The company's CEO, Torben Kleinfeldt; and CFO, Tim Hameister, will guide you through the presentation and the figures shortly, followed by a Q&A session via audio line and chat box.
Having said this, Torben, the stage is yours.
Yes. Thank you very much, and also a warm welcome from my side. Welcome to the Friedrich Vorwerk Earnings Call 2025. I will, for everybody who is not in detail familiar with Friedrich Vorwerk, run you very quickly through the main topics of our company and then give you a short market update about the latest developments in our main markets. Then I will hand over to Tim for, of course, the financial figures, which are key to this meeting here. And then I will give you a business update about our current projects we are running at the moment, at least the large ones.
So yes, Friedrich Vorwerk has been active since founding in 1962. So with more than 60 years of experience in the business of engineering and constructing energy infrastructure here in Germany, mainly. We can look back at numerous very successful projects in our highly attractive main market, which is natural gas transition, electricity transition, clean hydrogen transition, and of course, adjacent opportunities where we sum up our activities in district heating, CO2 treatment and transport and treatment of biomethane. Today, we are operating from 14 locations within the north, mainly in the north of Germany with more than 2,200 well-trained employees.
And yes, due to the energy transition, which is still going on here in Germany, we can look back at a very strong order intake already also in 2025. So we were able to acquire projects in a total volume of almost EUR 1 billion in 2025, which is an increase of 27% compared to the figures of the year 2024. Yes, where do these order intake come from? Main customers here in our 3 markets are, of course, the large TSOs operating the energy transport grids, not only in Germany, but also in the middle of Europe. So it could be in terms of electricity transition companies called TenneT and Amprion in looking at the market in clean hydrogen transition and natural gas transition, we have customers like Open Grid Europe, Gasunie and others. But of course, you can also find petrochemical companies and cable manufacturers within our customers.
Yes. So what's the latest market update. First, I want to focus on the development of -- since German government has agreed with the EU Commission to set up new power plants in Germany. These very flexible power plants are necessary to support the production of renewable energy, mainly driven by wind and solar farms. And at times, you don't have wind and solar available. You need to have an energy source, which can be ramped up very quickly. So Germany is planning to install roughly 10 gigawatts of capacity in terms of gas-driven power plants. And that, of course, is an opportunity also for Friedrich Vorwerk Group, both in pipeline construction to run new natural gas pipelines and later on also hydrogen pipelines towards these gas-fired power stations.
But also, we have a division in our plant construction department, which can supply the necessary fuel gas systems to supply those turbines delivered by companies like Siemens, GE or others. Other latest developments since we have all heard that the hydrogen economy has been struggling a bit over the last month. German Parliament has passed a so-called Hydrogen Acceleration Act. Main part of that is, of course, to install the so-called core grid for hydrogen transport in Germany, which could be the nucleus to develop the hydrogen industry in Germany because it will cut off costs for transport of hydrogen when the core grid is available and consumers and also producers of hydrogen can be easily connected to this grid. But also they want to secure and make investments in hydrogen production here locally in Germany easier and more reliable for the investors.
And of course, all our other businesses like natural gas transition is also still ongoing since new LNG terminals are still developed on the coast of Germany. So the Bundesnetzagentur has just published the first draft of the new grid development plan, combining the investments in natural gas grid development and hydrogen grid development. And this plan looks out to the year 2035 with still investments in the natural gas grid of roughly EUR 3 billion. And they also found out that probably developing the core grid for hydrogen will be more costly than predicted 2 years ago. So the revised plan for setting up the hydrogen core grid roughly sketches out investments of EUR 25 billion instead of EUR 20 billion, which was estimated before. So also here, in the market of natural gas and hydrogen, huge potential for our company's group.
And therefore, I would like to hand over to Tim for last year's financial figures.
Thanks a lot, Torben. And also a warm welcome, everyone, from my side to today's earnings call. Overall, 2025 was a fantastic year for Friedrich Vorwerk. We achieved record-breaking results across all KPIs, successfully completed 2 acquisitions, secured numerous new major projects. And last but not least, we launched our proprietary welding robot in collaboration with our subsidiary, 5C Tech. Therefore, I'm very pleased to now present these strong results in detail.
In terms of revenue, we've steadily increased over the course of the financial year and delivered a fantastic final quarter, which despite the seasonal nature of the business, nearly matched the strong performance of Q3. Overall, we benefited from favorable weather conditions in fiscal year 2025, not only in Q4, but especially in the first quarter when we were able to resume work after a short winter break on many projects as early as mid-January. This point, I would also like to briefly note that the first quarter does not always benefit from good weather conditions. This year, for example, in 2026, we've seen a harsher winter again after a long time with plenty of ice and snow, particularly in Northern Germany, resulting in a question of production stoppages even in February.
However, depending on weather conditions in the next quarters that are more relevant in terms of revenue and earnings, we expect to be able to offset at least parts of this effect over the course of the year. For the full year 2025, we generated revenue of EUR 704 million, representing a remarkable 41% increase over the previous year. This was primarily due to our continued success in recruiting new employees, which led to a 15% increase in the average number of employees as well as an increase in productive hours per employee, higher equipment utilization and, of course, some pricing effects. The electricity segment's share of revenue has contributed -- has continued to rise, now standing at 52%, making it the primary driver of growth in 2025. While this is largely attributable to A-Nord, we are simultaneously working on several medium-sized projects in this segment, such as BorWin6, the Baltrum HDD project and several converter stations as well.
2/3 of the current order backlog is attributable to this segment. So continued growth is expected here. At the same time, we anticipate a significant growth momentum from the Clean Hydrogen segment as larger subprojects on the hydrogen core grid are also expected to be put out to tender in the foreseeable future. Furthermore, we expect additional growth in the adjacent opportunity segments in 2027 and the following years due to the German government special fund. The development of profitability was particularly impressive in the fourth quarter with an EBITDA margin of almost 29% and EBIT margin of almost 25%, even taking into account the dilutive effect of the cost plus fee contract in our major A-Nord project.
In addition to the favorable weather conditions already mentioned in Q4, our success in claim negotiations, which typically take place in the fourth quarter was a key factor in the exceptionally high margin, along with higher earnings from joint ventures, which increased by nearly EUR 10 million compared to the same quarter of previous year. Accordingly, we also concluded the 2025 financial year as a whole, thanks to our high-quality order backlog and a flawless project execution were successful. We increased the EBITDA margin by 7 percentage points from 16.2% to 23.2% and more than doubled EBIT from EUR 59 million to EUR 137 million. Despite the tremendous 40% growth, we still managed to further reduce trade working capital, which along with the higher profitability, played a significant role in improving the net cash position.
As a result, we were able to increase net cash by more than EUR 100 million compared to previous year, bringing it to EUR 262 million at year's end. It should be noted, however, that the trade working capital is always at its lowest level at the end of the year and rises as the construction season progresses. These swings between summer and winter can amount up to EUR 80 million or even EUR 90 million. With regards to capital allocation, our top priority remains investing in organic growth, specifically in the purchase of new pipe layers, drilling rigs, cranes and excavators and of course, our welding robots. We've budgeted approximately EUR 50 million for this in 2026. Furthermore, we will certainly be open to pursuing a larger M&A deal again provided we find the right target and of course, at a reasonable price. And finally, we would like to share the company's success with shareholders in form of a significantly higher dividend payout, consisting of EUR 0.70 base dividend and a EUR 0.40 special dividend.
Let's now take a look at the development of order intake. In addition to the conventional order intake figure, we've already introduced a new KPI last year, the total project volume acquired. This new KPI also includes a proportionate project volume from the joint ventures in which Vorwerk is involved. And therefore, in our opinion, provides a more transparent view of the actual order situation regardless of the structure of the contract. The total project volume acquired rose by 29% to EUR 991 million in 2025, while conventional order intake at EUR 538 million is around 20% below previous year. The main reasons for this are, on the one hand, a shift in the order structure towards more joint ventures, especially in H1 2025. And on the other hand, our already well-filled order book, combined with a limited capacity of our resources.
The order backlog, which corresponds to the conventional order intake figure declined, therefore, slightly to EUR 1 billion for the reasons stated before. We've learned from several investors that the communication regarding order intake and the contract structure is not yet clear enough. Therefore, we are currently working on reporting an order backlog KPI that includes our share of joint venture projects as well, starting with the Q1 report. And I expect that this additional metric will provide a transparent picture for all shareholders by then at the latest.
Yes, and then based on our consistently high-quality order backlog, we expect our growth trajectory to continue in 2026 with revenues in the range of EUR 730 million to EUR 780 million. It should be noted that following 2 years of very high employee growth, we intend to slow down the expansion of our workforce somewhat in 2026 to give the organization and the administrative functions the opportunity to grow at the same pace while simultaneously focusing our recruiting efforts on attracting senior construction and project managers. At the same time, revenue growth is somewhat slower in 2026 due to the higher proportion of joint ventures. And this change in the project mix also means that we are now forecasting absolute EBITDA instead of EBITDA margin, specifically in the range of EUR 160 million to EUR 180 million for 2026 as this number is unaffected by the order structure. This guidance also takes into account the slightly softer Q1 2026 due to the adverse weather conditions.
With that, I'd like to hand back to Torben for the business update.
Yes, Tim, thank you very much. And of course, we did pick for this meeting our most outstanding projects at the moment. Please remember that during the year, we are operating on more than 500 smaller, midsized and also large projects. So we can, in this meeting, only give you a glance of the most outstanding projects. And I would like to start with the natural gas business here. It's a project we've already been working on last year. It's the so-called EWA pipeline, which is a 48-inch pipeline running from the caverns of Etzel towards compressor station of Wardenburg. This pipeline will continue in size of 40-inch towards the station of Drohne, which is more to the Rhine-Ruhr area, so in the south of the area. We have already finished the construction on EWA last year with a pressure test and the handover to the customer. So there's already gas on this pipeline.
And the WAD pipeline is construction progress at the moment. We have already started in January with the first wells on site using our new welding robot, PX2 developed by our subsidiary, 5C Tech. We have completed roughly 400 wells on the project this year. And again, with very, very low mistakes in the wells. So it's -- the repair rate is definitely under 2%, which is very good in terms of fully automatic welding. Yes, changing actually over to the next natural gas pipeline project, which is, at the moment, our still largest project executed in a joint venture between the Habau Group and the Friedrich Vorwerk Group, compromises of 2 pipelines. First, the ETL 182 with a diameter of 56-inch and the ETL 179.200, which is a 36-inch pipeline. Altogether, a mid-3-digit million euro project and both pipelines are being executed by the same joint venture combination.
As you can see in the picture below, we have already started some civil works to erect the pipe yards that has been done already in 2025, and we have already received most of the project pipes, which are purchased by our customer Gasunie. And we've actually started in the latest weeks to make preparations for the first loading procedures, so for the tunnel crossings and for the horizontal directional drilling, operations are already in place and will be executed in due course of this year.
And then maybe next slide, we are not only active in pipeline cable laying, but our plant division construction is also very busy with a new project at a gas metering station called Groß Koris. This is the main metering and supply station for the company, ONTRAS. Here, we have a project to renew the full installation at Groß Koris with a volume of mid-2 million-digit range. And we have to deliver the full scope of engineering and also construction activities and will then commission the new plant as is foreseen at the moment in 2028. And the system will already be constructed in a hydrogen-ready way. So later on, once the usage of natural gas in the system is over, it can be easily converted to use for clean hydrogen and meter and also regulate the hydrogen being transferred in the grid.
Next project is also a hydrogen project, which we have already been working for 1.5 years. This is the so-called HH-WIN project. So the city of Hamburg is trying to set up a hydrogen grid in the Port of Hamburg. Key figures here is an electrolyzer plant, which is located at the former power -- electrical power station of Moorburg, where about 100 megawatts equality of hydrogen is being produced and then fed into the Habau Grid, so the HH-WIN grid. And Friedrich Vorwerk has already executed 3 lots of this newly established hydrogen grid. And we have been recently awarded with 2 new lots to set up this hydrogen grid. The first lot involves actually a micro tunnel of almost 200 meters where we later on install the piping DN 300 for the transfer of hydrogen. And the following lot compromises of roughly 1,500 meters of new build hydrogen pipeline.
But besides those existing projects where we've already started execution, we are, of course, still busy in our estimation department working on new estimates for new projects. Just to give you a small idea what could be coming up over the next years. In terms of pure natural gas transition, we are at the moment, working on estimation for the so-called Spessart-Odenwald-Leitung, which is also DN 1000 pipeline, about 115 kilometers long for Terranets and also other projects coming up from Open Grid Europe, setting up the core grid for hydrogen here in Germany. And also for Gasunie, new projects like ETL 187, which is directly in conjunction with the current project ETL 182, is at the moment in tendering phase and execution and commissioning would then be in '27, '28.
But also still very attractive is the electrical market, where we are now facing the so-called second wave of large-scale electricity highways, projects like NordOstLink Section 2, SuedOstLink and SuedOstLink+ are being tendered out over probably end of this year and beginning of next year. And these projects will be commissioned in the mid-2034s -- in the mid-2030s. So also here, a huge potential also after 2030 for our company's group. And under adjacent opportunities, we were able to already win lot of the Rheinwater transport pipeline. This is a very large diameter pipeline, 2.2 meters in diameter that will later on transfer water from the river Rhine to flood the coal mines of RWE. And at the moment, we are working on the next lot to establish this water transfer pipeline.
And also a very new business to our company, the transport of CO2 is ongoing. So the first tender we have received is the CO2 link from Lagerdorf, where Holcim is operating a cement factory towards the port of Brunsbuttel is on the table at the moment. Commissioning is foreseen for 2029 and tendering phase ongoing and probably construction phase will be '28 to '29. So this, of course, can only be done if we can establish to grow our headcount and our number of employees where we were very successful last year. So today, we can look at a workforce of more than 2,200 employees. Of course, the labor market within Germany, especially due to the low capacity in building construction, we were able to employ a lot of new blue-collar workers we could integrate in our projects. And probably during this year, we will definitely have a focus on growing our engineering staff and our overhead staff on the construction site. So challenge will be also to look for well-educated project managers and construction managers to manage all the blue-collar employees we were able to attract over the last month.
Yes, that's it from our side. We are happy to receive your questions either by phone or by chatbot, and happy to answer them.
[Operator Instructions] And the first hand is up from Lasse Stueben.
2. Question Answer
I wanted to ask just on the Q1. Is there any more color you can give roughly in terms of what we should expect in a year-on-year comparison just to avoid any sort of nasty surprises. The second question would be, what should we expect for headcount growth broadly in '26? And then the third question is, you mentioned sort of slowing down headcount growth, but then you also said that you would be willing to do a larger M&A or potentially do a larger M&A transaction. So how do we kind of square those 2 kind of comments? Because I guess a larger M&A deal would also involve many new employees. So just any color there would be great.
Well, we've seen compared to the year before, some weeks of weather-related production stoppages in February, combined with the growth of the headcount could be possible to see a rather flat Q1 in 2026 in terms of revenue growth. And as I said, which could potentially partly be offset by stronger quarters in Q2 and Q3 as the overall share of Q1 on the full year revenue isn't that relevant.
Regarding the headcount growth, when we talk about slowing down recruiting efforts, this is only in terms of organic growth, meaning directly hiring people, not including any M&A. From organic growth side, we expect to grow headcount by 5% to 8% in 2026 and any M&A would be add-on, on that. And of course, usually, we also acquire project managers and the respective engineering and administrative functions when doing a larger M&A deal.
And additionally and slightly regarding question in the chat. Friedrich Vorwerk is guiding for a slightly lower margin in 2026 compared to a strong 2025, midpoint of 2026 guidance at 22.5% versus 23.1% in 2025 despite continued revenue growth. Could you provide a margin bridge for 2026 versus 2025 and outline the key driving factors?
Well, we've always communicated that we see the margin potential in the mid- to long term at our company between 20% and 22%. However, in particularly strong years as in 2025, it's also possible to achieve an even better margin, more than 23% due to basically a flawless project execution, good weather conditions and so on. But on the long run, we feel pretty confident with 21%, 22%.
And the follow-up from the person. Could you please provide more details on the Nord-A project, specifically regarding the recent delays and their potential impact on bonus malus payments. Additionally, is there any bonus or malus effect already factored into the 2026 guidance?
Yes. As we already communicated last year, A-Nord project is expected to be slightly delayed with completion now anticipated in summer 2027 instead of end of 2026 due to missing permits. We are still in discussions regarding adjustments to the bonus-related milestones. And these discussions have been ongoing for some time. We do not yet have a definite outcome on these discussions, but we remain still confident and hope to sign their respective contract amendment in the course of the second quarter 2026. And based on this information, at least a portion of the contract liability we've already included into the books since and accrued over the project duration. Part of that could be reversed once this amendment is signed in the second quarter. However, we did not factor in any positive impacts from that amendment as it is not signed yet.
And for now, we have no further questions. Ladies and gentlemen, I will hold the room for another moment in case someone might be typing right now. And there is a hand up from Lasse Stueben, again.
Great. Just a follow-up on sort of -- you mentioned kind of the JV share of projects is obviously going up. Should we expect that kind of level of the JV income you saw in '25 to be roughly the same in 2026? Or how should we think about that?
All the new JVs we entered into last year, we expect to -- that the net earnings of the JVs will even increase compared to 2025.
And another hand up from Leon Muhlenbruch.
I have a quick question regarding to the current geopolitical situation. With the energy crisis already on the way and inflation likely to rise similarly to 2022, which had a significant impact on Friedrich Vorwerk, how are you prepared for such a scenario?
Well, first of all, we were able to have a better negotiation position in most of the contracts that are in the order backlog at the moment. So most of the contracts have included price escalation clauses. So we can -- on the most bigger projects, we can forward the price escalations to our customers, although, of course, not to 100% because they are mainly bound to indexes which are more general, for example, the steel index or the crude oil index, which is not always 100% equivalent to the products we are actually using in our projects. But in the end, we can at least -- we are at least in a way better position this year than in 2022. Also in 2022, most impact was from a plant construction project where we had to bring a lot of material to the project. If we look at the current large-scale projects we are operating on, it's mainly the pipeline projects where the bare pipe is supplied by our customers. So we are mainly supplying equipment and personnel, so services, which are, at the moment, not that much affected as back in 2022.
Another hand up from [ Lueder Schumacher ].
I've got a few questions on margins. One is, are there any kind of older projects which have lower margins in them that which are running out and should be supportive to the group margin outlook once they do? And what about the margins implied in the order intake? Can we assume that they should be at a premium to the margins you've seen in 2025? Or should it more be in the region of the long-term potential of 20% to 22% you've been hinting at?
Well, there are currently no such legacy projects in the current order backlog, although we still have the dilutive effect from our major project A-Nord, which will run until summer 2027, where the base margin is definitely lower than the group average. Apart from that, there are no legacy projects with low margins. And well, I mean, we have already seen such strong margins in 2025. We do not expect that we can further increase this margin profile. And therefore, rather to suggest that you can assume the long-term potential at around 21%, 22% for the next years.
In your order intake you had in 2025, we should already assume this? Or is this still at the margins you've seen in '25?
Well, the margin profile calculated in those projects is roughly on the same level as we've seen the year before. However, on the one hand side is the calculated margin. On the other hand side, is the actual project execution on the fields. And this has also a major impact on the earnings in the end.
And we're moving on to 2 questions in our chat. Are you planning any buybacks? What are the key impacts for the Iran war for you? And what are you doing to hedge against it? For example, natural gas inflation, diesel?
At the moment, there are no plans for any share buybacks. We've decided to instead increase the dividend and to also pay out the special dividend of EUR 0.40 per share. Adding on the answer from Torben regarding Iran, the major impact for us at the moment is, of course, the higher cost for fuel, especially diesel. To give you some color on that, the total cost of diesel last year was around EUR 12 million. So it's not the largest position in our P&L statement. And we've, of course, already hedged some of the amounts needed already before the war in Iran. So there will be, of course, some effect, but not a significant one.
But on the other hand, the crisis also has a positive impact on the market because at the moment, customers are really pushing the projects and trying to get more LNG receiving capacity in Germany, which then, of course, also means constructing new pipelines and constructing new plants, which is then also good on the market side for us.
Can you discuss your appetite to revisit medium- to long-term guidance? And what milestones would trigger an upgrade?
Well, that's definitely a thing to consider this year as we are pretty well on track on the older mid- to long-term outlook. So maybe we can expect to see a new outlook in the second half of this year.
Ladies and gentlemen, we still have a minute for your questions left. And if there should be no further ones, you can always get in contact with Investor Relations. And this is it. With no further questions, we come to the end of today's earnings call. Thank you very much for your interest in Friedrich Vorwerk Group SE. A big thank you also to you, Torben and Tim, for your presentation and your time. I wish you a successful day around the world and giving the last words to Torben again.
Yes. Thank you very much for listening. I think especially this year, we can look at some very, very interesting projects we can execute for our customers. And please stay with us and hear the latest news from our projects in the future. Have a good time around the world. Bye-bye.
Bye.
Friedrich Vorwerk Group — Q3 2025 Earnings Call
1. Management Discussion
Good day, ladies and gentlemen, and I warmly welcome you to today's conference call of the Friedrich Vorwerk Group SE following the Q3 figures of 2025.
And as always, I'm delighted to welcome CEO, Torben Kleinfeldt; and CEO, Tim Hameister. So the gentlemen will speak shortly and guide us through the presentation and the results. And afterwards, we will be happy to take your questions if you may have.
And having said this, Mr. Kleinfeldt, the stage is yours.
Thank you very much, and also a very warm welcome from my side. My name is Torben Kleinfeldt, CEO of the Friedrich Vorwerk Group SE. I'm on board Friedrich Vorwerk already since 2001 from profession civil engineer. And I'm responsible of the total overall strategy of the company group and also still focused on a lot of hydrogen projects, which are in progress here in our company's group.
Yes, a little bit about Friedrich Vorwerk in detail to all of us who have not seen us yet, Friedrich Vorwerk Group is active since 60 years in the industry of energy infrastructure. The company group is very well represented in the northern part of Germany with 40 locations, about 2,200 employees by today. And we can look back on a very strong growth over the last 5 years with an annual growth of above 20% each year.
Our main markets here in Friedrich Vorwerk is, as I said, energy infrastructure, mainly covering natural gas, electricity, hydrogen and we have a -- other piece of adjacent opportunities where we cover all our expertise and services in biomethane treatment and also in district heating. And the business update will today will shine another light on some upcoming projects, which would be within our adjacent opportunities here as well.
Main customers, of course, the large TSOs operating here in Germany. So on the electricity side, we see TenneT, Amprion, 50Hertz. On the gas side, it's more Open Grid Europe, Ontras, Gascaribe, these are our main customers, but for very special services also serving the chemical and petrochemical industry here in Northern Europe.
Due to the energy transition going on here in Germany and in Europe, we can look back on a very strong order backlog today, still having more than EUR 1 billion of orders in the book by today. So what is Friedrich Vorwerk actually doing? Very short update on that or not an update, but a very short introduction to our business. This slide basically represents what we are doing.
On the top, you can see our activities within the natural gas infrastructure. So usually, we are able to set up LNG plants or cross-country pipelines and cross-country stations where Germany is taking over natural gas from various sources outside Germany. Then we are able to engineer and also construct large diameter pipelines to transfer the natural gas to, for example, storage facilities or compressor stations, which are needed roughly all 200 to 300 kilometers in the pipeline to boost the flow of gas and finally bring the natural gas to the consumers.
And right at the edge of the consumers, which could be a big city or an industrial plant, it requires also gas pressure, let down and regulator stations to supply the natural gas in the right pressure and the right volume. And of course, there, it needs to be metered for later invoicing as well.
So Friedrich Vorwerk is basically able to engineer and also set up, maintain and operate all these components of the natural gas split. Pretty much the same activities. We can supply on the future hydrogen grids, which you can see at the very bottom of this slide, except that, of course, hydrogen cannot be found in nature. So it has to be made by splitting water into oxygen and hydrogen. This is basically done by large electrolyzer stations, where we are also able to supply engineering services, and we have a full range of small to medium electrolyzer arrays from 1 megawatt to 5 megawatt, which we can supply to the market.
Business in electricity infrastructure, which is shown here in the middle of this slide, looks a bit different. Usually, our services start when we take over underground cable lines from offshore units. So when new wind farms that are situated outside in the North and the Baltic Sea, cables have to be transferred to land. There's a so-called landfall, which is typically done by a horizontal directional drilling method to under board the crucial environmental areas on the shores of the North and the Baltic seas. And then we are able to engineer and also run underground cables to the next transformer of converter stations with laying cables, we can handle up to 525 kilovolt in transmission voltage. And we are also able to engineer and set up transformer inverter stations, inverter stations unnecessary to switch the current from AC to DC.
And of course, in today's grids, we can also connect the electricity grid to the heat grid. So we are also able to engineer and set up large-scale power to heat stations.
Okay. Short business update, this time, not on our core markets, electricity, natural gas and hydrogen, but on some adjacent opportunities, which came up lately. First of all, I want to focus on what we call the NATO grid. The NATO grid here in Northern Europe has been set up in the cold war area. So in the -- starting in the '70s and '80s, on the right hand, you can see a sketch of the existing NATO pipeline grid, which is basically transferring jet fuel to crucial air fields of the [indiscernible] and the allies as you can see, basically, the NATO pipeline grid ends pretty much in the -- at the former inner-German border.
And now since activities are going more to the east, this nature pipeline grid will be expanded by another 300 kilometers towards the Polish German border and then also into Poland and possibly also to the Baltic states. Since this is the pipeline system, pumping fuel, this is, of course, within our scope and it's a very nice addition to our usual portfolio estimated costs to set up this pipeline grid is roughly EUR 5 billion and also the first steps and the signing of contracts with Poland has been done in October. So we really see that this project is being kicked off, and we'll probably see tenders from the NATO grid in 2027.
Next and also very interesting for us is decisions made by the German government concerning ramp-up of hydrogen activities here in Germany. First of all, of course, German government has emphasized that they're still looking for further investments in the pipeline infrastructure and also the plant infrastructure mainly focusing on setting up new electrolyzers to fill the hydrogen core grid, which is planned to be set up here in Germany until 2035, which, of course, requires not only the import of hydrogen, but also the production of hydrogen.
They also made decisions to accelerate the tenders by digitalization and which is, I think, the most important decision which has been taken that they also accept not only green hydrogen, but also other colors of hydrogen to be transferred in the corporate and make it available for the consumer. So that's very important decisions for our hydrogen activities.
And at the moment, we really see that both on the pipeline side and on plant construction sites, new projects pop up, and we received quite a bit of inquiries for setting up electrolyzers and also pieces of pipeline grid, which is summarized under the core grid here in Germany.
And the third outlook I want to show is activities in CO2 transport because also here, very important decisions by the German government have been made in early November. So for example, they've agreed in general that we are able to split up the CO2 for certain industries, which cannot eliminate the emission of CO2. So for example, the cement industry is one of the core industries where you cannot get rid of the CO2 except to capture it and then transfer it to a storage facility.
And of course, one of our largest customers, Open Grid Europe is already looking into the future CO2 grid, which will connect the emitters of CO2 to the neighboring country, Belgium and Netherlands because these countries are able to take CO2 and pump it in former gas and oil wells to store there for a long, long time. And also one of the CO2 clusters, which is planned is the so-called Elbicluster, which is pretty much in front of our doorstep to transfer CO2 from the cement industry to the ports on the North Sea and then, there it will be liquefied and brought by shipped to Norway, and Norway is able to take over the CO2 and also store it in old natural gas wells.
That's it from my side for the moment. And with the update of our future -- possible future activities, and I would then hand over to my colleague, Tim, who will present the financial performance of the company's group for the third quarter.
Yes. Thanks a lot, Torben . Good afternoon, ladies and gentlemen, and a very warm welcome to our earnings call and the Q3 figures. My name is Tim Hameister, CFO of Vorwerk. And I'm very pleased to walk you through our extremely strong Q3 figures and the updated outlook today.
After reporting record revenue in the second quarter, we once again managed to beat that figure in the third quarter, achieving quarterly revenue of more than EUR 200 million for the first time in Vorwerk's history. Despite ambitious year-on-year figures, this represents growth of a fantastic 39%. Although the start of the third quarter in July was mixed due to challenging weather conditions, this was more than offset in August and September.
The continued success in recruiting contributed significantly to this, enabling us to hire more than 100 new employees in the third quarter alone, also including a small M&A transaction consisting of roughly 35 employees. From a project perspective, the largest revenue drivers in Q3 were, of course, still the large-scale Anord project, followed by a number of pipeline projects, such as the EWA pipeline as well as several large volume gas pressure regulating and metering stations, which ensured high capacity utilization for our plant construction division.
Consolidated revenue for the first 9 months of the year amounted to EUR 505 million, representing growth of 49% compared with the previous year. In both percentage and absolute terms, our electricity segment was once again the growth driver. However, it's also noteworthy that absolute revenue in the natural gas segment increased slightly again compared to the previous year, particularly due to the high number of plant construction projects.
Revenue in the clean hydrogen and adjacent opportunity segments is roughly on the same level as the previous year. However, the development of profitability in the third quarter is particularly remarkable. Once again, the already very solid EBITDA margin of 21% in the second quarter was improved by another 4 percentage points to 25.4%, compared to the previous year, this represents an increase of 8 percentage points and a doubling of absolute EBITDA to over EUR 50 million.
The EBIT margin even rose by 5 percentage points to a new record high of 19.1%, corresponding to EBIT of EUR 45 million alone in Q3. All segments contributed to this improvement in earnings are the largest increases that were achieved in the pipeline construction projects.
In addition, the share of profits from joint ventures, [indiscernible] doubled compared with the previous year due to the higher number of projects awarded in this specific contract structure. Accordingly, the 9-month period closed with EBITDA of EUR 105.8 million, corresponding to a margin of 20.9% and adjusted EBIT of EUR 87.3 million or an EBIT margin of 17.3%.
These fantastic results include minor catch-up effects in the mid-single-digit million euro range from variation and change order negotiations, but as already in Q2, the vast majority was achieved with our ongoing projects fueled by our high-quality order backlog.
Now let's take a look at the development of order intake. In addition to the conventional order intake figure, we've introduced a new KPI with the half year figures, the total project volume acquired. And I would like to use the opportunity to once again explain the differences between the two key figures to all shareholders who were not present at our last earnings call.
So there are basically two different types of project structures. In Option A, Vorwerk acts as a general contractor and handles the entire project through its own P&L statement, which means that 100% of the order value goes into order intake and later into revenue.
And the second option, the client awards the entire project to a joint venture. And in this constellation, we do not show the proportional share of the total order volume and conventional order intake. Instead, we are only allowed to show the supply of personnel and equipment to the joint venture, which can, in some cases, be significantly lower than the proportional share of the total project.
The order intake figure, therefore, does not reflect the actual project volume handled by the Vorwerk Group, which is why we also report this new K figure. And this KPI also includes the proportionate project volume from the joint ventures in which Vorwerk involved. And therefore, in our opinion, provides a more transparent view of the actual order situation, regardless of the type to contract structure.
So the total project volume acquired rose by 45% to EUR 886 million in the first 9 months of 2025, while conventional order intake at EUR 419 million is around 20% below the same period last year. The main reasons for this are, on the one hand, the shift in the order structure toward joint ventures, especially in H1 2025. And on the other hand, our already well-filled order book.
Nevertheless, we've also acquired many new and attractive projects in 2025. Some of them, Torben will present later in this call. The order backlog, which corresponds to order intake declined slightly to EUR 1.1 billion for the reasons stated before and currently consists of around 70% order volume attributable to the electricity segment.
In addition to the strong development in both revenues and profitability, the development of net cash is impressive as well. Compared to Q3 2024, we've increased net cash by EUR 80 million to EUR 112 million. And thereby creating an excellent basis for further organic and acquisition-driven growth. The main reasons for the significant increase are, firstly, significantly higher profitability. Secondly, an improved negotiation position with regards to the payment terms in the contracts and thirdly, improved working capital management with regards to our internal processes and project controlling.
Yes. And based on the strong performance in the current year and especially in Q3 and an unchanged positive outlook, we raised our guidance already for the second time this year, a few weeks ago. We now expect revenues in the range of EUR 650 million to EUR 680 million with an EBITDA margin of 20% to 20%, 22%, which corresponds to a margin improvement of 5 percentage points at the midpoint year-on-year.
Now let me now hand it back to Torben for some updates on the ongoing and upcoming projects before we open the floor to your questions.
Tim, thank you very much. Yes, very proud to present another major pipeline project, which will be executed in 2026. It is a project driven by German Gasunie division. The project is strongly in conjunction with the ETL 182, which is a 56-inch pipeline running from Stuttgard at the river banks of the Elbit towards the city of Bremen. In the end, this pipeline will be constructed also by a joint venture driven by Friedrich Vorwerk to bring regasified natural gas from Stuttgard to a hub in close to Bremen and the ETL 179.200, which has been awarded in the last month also to the same joint venture will basically connect the Dow Chemical facility, which is located in the northwest of the city of Stuttgard to this new pipeline grid.
It is a 900 so 36-inch pipeline, roughly length is 18 kilometers, very difficult terrain for constructing pipelines. But since it is tight conjunction with the ETL 182. This is a very nice top-up to the existing project and we are actually managing this project also with the same resources as the other project.
So second project I would like to represent is the TenneT project, which has already been ongoing this summer. It is one of the landfall projects, which is driven by TenneT, basically a framework contract where we are entitled to cross different islands north of the mainland of Germany in the North Sea by means of horizontal directional drilling.
We have to execute in total 39 boreholes for the later use of -- with the cable -- with the high-voltage cables. We have already executed five drillings under the island of Baltrum this year and basically stopped operations now over the winter and we'll continue with the operations on the island of Baltrum next year in May when the window for working in the [indiscernible] is being opened.
And once all the cables under the island of Baltrum have been laid, we'll shift to the next islands and then also to Buzon, which is shown here on the top right side of the picture. Friedrich Vorwerk and [indiscernible] share here in this joint venture is roughly 40%. So we'll also be entitled to do most of the drillings, which are necessary to complete all landfalls.
Third project I want to focus on today is also from natural gas or hydrogen market. It's a plant construction project, a rather large gas metering stations and pressure letdown station, which is located at the compressor station in Boa, which is in former Eastern Germany. This project is set up by Ontras Gas Transport, and it is necessary to transfer hydrogen, which is taken over from the YAGAL pipeline and will be supplied into the grid of Ontras Gas Transport, where it is then transported to numerous industrial consumers in Sachsen and Sachsen-Anhalt.
Friedrich Vorwerk not only has the contract to set up this plant, but also to do the full detailed engineering scope. And we have already started executing the engineering part of the project and will then be executing the actual project in 2027 and 2028. So here also a very nice project for our Plant Construction division, not only here in Halle Saale, but also in [ Vismore ] for the prefabrication activities, which are necessary to perform this project.
Final project I want to focus on is another district heating project. You know that we have just finished the so-called [indiscernible] in the city of Hamburg, which is a large diameter district heating system, bringing heat from industrial producers in the port area of Hamburg to the north. And the follow-up project is, so to say, the -- it's called the [indiscernible], which in the end then transports the heat from these industrial consumers more in the middle of the city of Hamburg.
This is a project in tendered in 3 lots. We have actually been awarded with lot number three. Pipeline here is also flow in the return line, diameter DN600 and 700 millimeters right in the middle of Hamburg. So very difficult inner city terrain to execute. But since we have a very well trained and very well executing district heating team here, we are really happy to have won this project so they continue -- they can continue their good work from the previous projects. And also looking in the future, there will be numerous district heating projects, especially in the city of Hamburg.
For example, we are at the moment working on the tender for constructing also a large diameter pipeline grid towards the airport of Hamburg, which will later on supply the actual airport and also the Lufthansa facilities, which are located right at the Hamburg Airport.
Yes. Now final slide from my side, at least on the technical part, is a short update on our newly developed welding system, the so-called PX2. PX2 has been developed and is also operated by our subsidiary, 5 CTECT welding system, fully automatic, being able to trace the actual well, so it can adjust automatically. It doesn't need an operator anymore to be run around the pipeline. system has first been tested on the EWA pipeline this year and has now continued on the pipeline. First experience, very high productivity, very little weld defects. We had a defect quota of below 1%. So repair rate below 1%, which is very unusual in the past with other welding systems, we had almost double-digit repair rates.
So we are very, very happy to have developed the system, and we were already able to receive contracts outside Germany, for example, in Croatia and Turkey. And at the moment, we are actually supplying welding services in Turkey to a 40-inch pipeline and quite happy with the production. We are doing almost 100 wells a day, which is a very, very good performance and still with a very low repair rate. So the investment in the development of the new PX2 system is, in general, very good for us and opens up a complete new market also on international projects.
And of course, finally, switching back to our HR department, I think Tim already focused on it. We have grown by more than 13% in the third quarter of 2025. So taking on a lot of new employees. And in the end, that has really helped for numerous projects, and we are -- we hope we can keep up the pace with our employees and hope with all these people on board for a very successful 2026.
This is the end of our presentation, and we are, of course, very happy to take your questions.
[Operator Instructions] We received the first question, or hand from Mr. Stueben.
2. Question Answer
I'll have three questions, please. First of all, the margin profile in the natural gas segment, it was really high again in Q3. I know that's probably in part due to those negotiation payments. But I'm just wondering, can you just give some more explanation to that? And what we should be looking for in terms of the margin profile going forward?
The second one is you spoke in the past about a potential delay on the Anord project. I just wanted to ask how that is looking or if there's an update there and what the possible impact is for you?
And the third one is the duration of your backlog now. That EUR 1.1 billion that you have in terms of the phasing, does that already cover you for potential double-digit growth in 2026? Or is there still, I guess, some gaps to fill with some short-term projects for 2026 to potentially achieve double-digit growth?
Yes. Thanks for joining today, Lasse. I would like to start with the first question regarding the segment profitability. In Q3, there were actually two drivers for the strong margin for the natural gas margin. On the one hand side, I already mentioned, there were some negotiation one-off effects from change in variation orders from past projects.
And the second effect here was the high share of joint venture profits because this structure is mainly used at the moment in pipeline construction projects. Regarding your second question, Anord, I still foresee that there will be delays in construction due to a lack of building clearance, especially in terms of missing permits, and we are still in constructive discussions with the client to adjust also the relevant targets for the bonus-malus clause since it's not our risk here in the end. So the customer is responsible for obtaining the permits. And we expect to have a result here on this before Christmas this year.
Regarding the third question, the backlog. There are just a few projects such as the [indiscernible] project, Torben , as presented, the [indiscernible] duration until 2028. But apart from that, the majority of the backlog will be transferred into revenue in 2026 and 2027. And therefore, we have a very strong basis for further growth in both of the 2 years.
All right. Thank you so much. Yes, no, we did not receive any further questions. So having said that, we received -- yes, just go ahead with you. The follow-up.
Yes. Just a follow-up, please. And then just on guidance, revenue guidance for this year. I mean, we've seen in last year, I know it was probably a bit special with Q4 being stronger than Q3. Guidance this year implies that Q4 is quite a bit weaker. So I'm just wondering, sort of -- what the thoughts are behind that and what that kind of means in terms of also potentially a contribution from Anord. I saw it was roughly EUR 180 million in 9 months. I think originally, you were guiding for I think, EUR 250 million or above for this year. So I'm just wondering if that's still current or if we should be modeling a bit less than EUR 250 million from Anord.
So based on the current forecast and the Q3 figures, this would imply revenues between EUR 145 million and EUR 175 million for the last quarter this year. When you think about the usual seasonality of our business, Q4 is easily weaker than Q2 and Q3, although we had an extraordinary strong Q4 last year.
But in general terms, it's are more likely to expect a weaker Q4, at least in terms of revenue due to the weather conditions and less working days since we usually close the construction sites mid-December. And of course, we also try to reflect risks and uncertainties from our project business within the guidance.
Regarding Anord due to the missing permits on some of the sections on the track. There will be shifts of revenue to 2027 as well, at least to the first half of 2027. And therefore, we expect that the revenue contribution this year will be a bit lower compared to previous expectations.
And in the meantime, we received questions in our chat box. And the first one is, to put it simply, which is the better leading indicator of future revenue recognition, the order intake or the new KPI total project volume in your opinion?
So in our opinion, it's of course, the total project volume acquired. That's the reason we have introduced this figure because can transparently show how much project volume is in the end, handled by the Vorwerk group. Although it's important to say that the total project volume is not the figure that will translate into revenue in the next years. Only the order intake will translate into revenue. However, you will see higher profit shares from these joint venture constructions so that in the end, the total EBITDA will be the same regardless of the contract structure.
Next question, how likely is it that you will be able to generate revenues with the CO2 transport network already next year, assuming the Federal Council's approval is greater this year?
We do expect not to have any revenues in CO2, at least not in the pipeline business because the first project is being set up here between cement industry farm in [indiscernible] in the Port of [indiscernible] We do expect that public permits for this projects will be applied for next year. We expect to have a duration of about 12 months to get the permits approved. So construction will probably be '27, '28, '29, but we already have some revenues in the CO2 business, we are delivering CO2 purification and liquification plans, especially as an add-on to our biomethane treatment plants.
So this liquefied CO2 goes in the food and also in the beverage industry. And we have already supplied a couple of CO2 electrification plans to the market until today.
And the next question, what are your plans for share buybacks?
Well, we have plans for at least capital allocation, not necessarily for share buybacks our priority number one, to use our cash is, of course, still organic growth, which means that we continue to invest primarily in technical equipment and machinery.
In addition, we have to take into account the working capital swings across the year and maintain a very solid balance sheet at all times as this is part also of the pre-liquification processes for our projects. Yes. In addition, we are keeping certain amounts of cash available for potential M&A transactions. And we also expect to pay a higher dividend in the next year since this is linked to the net profit of the company.
And another last question. Do you expect a higher margin in the electricity segment from H2 2027 onwards. Once Anord is completed and follow-up projects will not be executed via IPA?
Yes, of course, once the dilutive effect from the Anord project has run out in the next years, and there are no follow-up projects with this specific contract structure. We will, of course, expect higher margins in electricity as well.
So with you now chat and in the queue, there no further question pops up and that seems, we will come to the end of today's conference call. So thank you, everyone, for your showing interest in the Friedrich Vorwerk Group SE and also a big thank you to you, Mr. Kleinfeldt and Mr. Hameister for the time you took today. It was a pleasure to be a host, wish you all a lovely remaining day or evening and hand back for some final remarks, which concludes our call.
Yes. Thank you very much for hosting us. Also thanks for listening today. And I can only say let's keep fingers crossed that the weather stay with us to make it a very, very successful year here in 2025 for Friedrich Vorwerk and hope to come back with good news in the beginning of next year. All the best and bye-bye.
Friedrich Vorwerk Group — Q3 2025 Earnings Call
Financial data from Friedrich Vorwerk Group
Revenue
Revenue is the sum of all sales generated by a company, e.g. for its products or services.
Revenue (TTM) metric explainedDirect Costs
Direct costs are the costs incurred directly in connection with the manufacture of the product or service.
Gross Profit
Gross Profit indicates how much of the revenue remains in the company after deducting direct production costs. If the percentage share of sales is calculated, this is referred to as the gross margin.
Gross Profit metric explainedSelling and Administrative Expenses
Selling, general and administrative expenses (SG&A) include all expenses for marketing and sales as well as the general administration of the company.
Research and Development Expense
Research and development costs (R&D) provide information on how much the company invests in the research and development of its products. The costs are particularly interesting as a percentage of revenue and in comparison to direct competitors.
EBITDA
EBITDA (Earnings Before Interest, Taxes, Depreciation and Amortization) is the company's earnings before interest, taxes, depreciation and amortization. The EBITDA margin is calculated as a percentage of sales.
Depreciation and Amortization
Depreciation represents reductions in the value of the company's assets (e.g. due to wear and tear on machinery).
EBIT (Operating Income)
EBIT (Earnings Before Interest and Taxes) is the company's profit before interest and taxes, also known as the operating income. The EBIT Margin is calculated as a percentage of sales at
.
Net Profit
Net Profit represents the profit or loss after deduction of all costs.
Net Profit metric explainedStocksGuide Premium
| Jun '26 |
+/-
%
|
||
| Revenue | 739 739 |
22%
22%
100%
|
|
| - Direct Costs | 312 312 |
9%
9%
42%
|
|
| Gross Profit | 426 426 |
33%
33%
58%
|
|
| - Selling and Administrative Expenses | 197 197 |
18%
18%
27%
|
|
| - Research and Development Expense | - - |
-
-
|
|
| EBITDA | 169 169 |
61%
61%
23%
|
|
| - Depreciation and Amortization | 30 30 |
32%
32%
4%
|
|
| EBIT (Operating Income) EBIT | 138 138 |
69%
69%
19%
|
|
| Net Profit | 108 108 |
98%
98%
15%
|
|
In millions EUR.
Don't miss a Thing! We will send you all news about Friedrich Vorwerk Group directly to your mailbox free of charge.
If you wish, we will send you an e-mail every morning with news on stocks of your portfolios.
Friedrich Vorwerk Group Stock News
Company Profile
Friedrich Vorwerk Group SE designs, creates and operates energy infrastructure. It operates through the following segments; Natural Gas, Electricity, Clean Hydrogen and Adjacent Opportunities. The Natural Gas segment involves the transportation and transformation of raw natural gas into conditioned natural gas. The Electricity segment is focused on the underground transportation and transformation of electricity produced from climate-friendly, non-fossil energy sources such as wind, solar, water and renewable raw materials. The Clean Hydrogen segment involves the transportation of energy produced from climate-friendly energy sources into clean hydrogen as well as its transportation to end users. The Adjacent Opportunities segment bundles all other projects and partial projects that do not fall into any of the above three segments but require related or similar technological approaches. The company was founded on October 02, 2019 and is headquartered in Tostedt, Germany.
StocksGuide Premium
| Head office | Germany |
| CEO | Mr. Kleinfeldt |
| Employees | 2,331 |
| Founded | 2019 |
| Website | www.friedrich-vorwerk.de |


